Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Selective demolition and removal; concrete formwork; concrete reinforcement; cast-in-place concrete; structural steel; metal fabrications; rough carpentry; carpentry; preservative treated lumber; preformed metal roofing; fiber cement siding; elastomeric waterproof deck coating; flashing and sheet metal; sealants; metal doors and frames; flush wood doors; vinyl window; finish hardware; gypsum wallboard; resilient tile floor; painting; markerboards and tackboards; miscellaneous specialties; asbestos abatement; lead paint control measures; handling and disposal of mercury containing lamps; testing and air monitoring; general mechanical requirements; insulation of mechanical systems; air conditioning and ventilation; testing, adjusting and balancing (TAB); basic electrical requirements; electrical demolition; grounding and bonding; hangers & supports for electrical systems; electrical identification; conductors & cables; raceways and boxes; wiring devices; interior lighting, fire alarm system; and miscellaneous items
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Renovate Multi Purpose Room
Posted Date
-
Due Date
Jan 15, 2026
Release: -
Close: Jan 15, 2026
Renovate Multi Purpose Room
AvailableRequirement to renovate the operating rooms for a hybrid installtion.
Posted Date
Nov 12, 2025
Due Date
Jan 15, 2026
Release: Nov 12, 2025
Close: Jan 15, 2026
Requirement to renovate the operating rooms for a hybrid installtion.
AvailableWork includes renovate room 70.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Work includes renovate room 70.
AvailableRenovate Corrosion Control Hangar Blg 6626.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Renovate Corrosion Control Hangar Blg 6626.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis