Discover Opportunities months before the RFP drops
Learn more →Sale of real estate.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
Sale of real estate.
AvailableThe Project involves the comprehensive rehabilitation and upgrade of the Hess Mill Pump Station. The work includes, but is not limited to: Construction of a new auxiliary wet well to increase wastewater storage capacity. Installation of new sub-mersible chopper pumps. Replacement of the force main discharge manhole. Upgrade of the electrical service to 480V, 3-phase, 200A, including installation of a new service-rated Automatic Transfer Switch (ATS), a new Main Distribution Panel (MDP) with an integral step-down transformer and single-phase panelboard, and a new Pump Control Panel (PCP) with motor starters. Installation of a new 45 kW, 480V, 3-phase diesel standby generator and Automatic Transfer Switch (ATS). Replacement of the existing chain link fence with a new PVC fence. Removal of existing arborvitaes and new landscaping. All associated civil work, earthwork (including horizontal directional boring for the force main), piping, electrical wiring, controls, and site restoration. Temporary bypass pumping during construction.
Posted Date
Jul 24, 2025
Due Date
Aug 11, 2025
Release: Jul 24, 2025
Close: Aug 11, 2025
The Project involves the comprehensive rehabilitation and upgrade of the Hess Mill Pump Station. The work includes, but is not limited to: Construction of a new auxiliary wet well to increase wastewater storage capacity. Installation of new sub-mersible chopper pumps. Replacement of the force main discharge manhole. Upgrade of the electrical service to 480V, 3-phase, 200A, including installation of a new service-rated Automatic Transfer Switch (ATS), a new Main Distribution Panel (MDP) with an integral step-down transformer and single-phase panelboard, and a new Pump Control Panel (PCP) with motor starters. Installation of a new 45 kW, 480V, 3-phase diesel standby generator and Automatic Transfer Switch (ATS). Replacement of the existing chain link fence with a new PVC fence. Removal of existing arborvitaes and new landscaping. All associated civil work, earthwork (including horizontal directional boring for the force main), piping, electrical wiring, controls, and site restoration. Temporary bypass pumping during construction.
The contract delivery method will be a single general contract that will include roofing and associated construction and incidental civil, HVAC, electrical and plumbing scopes of work.
Posted Date
Jul 11, 2025
Due Date
Aug 11, 2025
Release: Jul 11, 2025
Close: Aug 11, 2025
The contract delivery method will be a single general contract that will include roofing and associated construction and incidental civil, HVAC, electrical and plumbing scopes of work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis