Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Troy Community Land Bank Corporation
TCLB seeks to Rebuild/Repair North Masonry wall.
Posted Date
Mar 25, 2026
Due Date
Apr 15, 2026
Release: Mar 25, 2026
Troy Community Land Bank Corporation
Close: Apr 15, 2026
TCLB seeks to Rebuild/Repair North Masonry wall.
AvailableTroy Community Land Bank Corporation
Seeking proposals from qualified fire protection contractors or design-build teams to design, permit, furnish, and install a complete, code-compliant automatic fire sprinkler system. Work includes design phase: perform site visit and assess architectural and MEP drawings; determine system type (NFPA 13 VS.13R) in consultation with code officials; produce hydraulic calculations and determine pipe sizing; coordinate location of risers, backflow preventer, FDC, and heads; prepare full stamped construction documents suitable for permit submission; respond to all reviewer comments and revise plans if required; installation phase: furnish all piping, valves, sprinkler heads, hangers, supports, and accessories; furnish and install backflow prevention device and FDC; coordinate fire alarm interface as required for flow/tamper switches; install the approved system; conduct all required inspections, hydrostatic testing, and final signoff.
Posted Date
Jul 17, 2025
Due Date
Aug 7, 2025
Release: Jul 17, 2025
Troy Community Land Bank Corporation
Close: Aug 7, 2025
Seeking proposals from qualified fire protection contractors or design-build teams to design, permit, furnish, and install a complete, code-compliant automatic fire sprinkler system. Work includes design phase: perform site visit and assess architectural and MEP drawings; determine system type (NFPA 13 VS.13R) in consultation with code officials; produce hydraulic calculations and determine pipe sizing; coordinate location of risers, backflow preventer, FDC, and heads; prepare full stamped construction documents suitable for permit submission; respond to all reviewer comments and revise plans if required; installation phase: furnish all piping, valves, sprinkler heads, hangers, supports, and accessories; furnish and install backflow prevention device and FDC; coordinate fire alarm interface as required for flow/tamper switches; install the approved system; conduct all required inspections, hydrostatic testing, and final signoff.
Troy Community Land Bank Corporation
Work includes to remove and replace entire roof including parapet walls.
Posted Date
Oct 3, 2024
Due Date
Oct 25, 2024
Release: Oct 3, 2024
Troy Community Land Bank Corporation
Close: Oct 25, 2024
Work includes to remove and replace entire roof including parapet walls.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Troy Community Land Bank Corporation's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database