Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Trout Unlimited
Removal of a culvert restricting fish passage, the restoration of the creek channel, and the construction of a new bridge to access properties previously served by the roadway over the culvert. The existing 48" dia. Corrugated metal culvert is approx. 26' in length. A scour pool has developed on both ends of the culvert. The selected contractor will remove the culvert, fill the scour pools with materials specified in the construction documents, restore the stream bed by removing fill placed during the culvert installation and placing new clean material in accordance with the plans and specifications, and construct the bridge to span the newly restored channel. The new 45' x 14' bridge will consist of a single span from bank to bank of beaver creek. The travelled bridge deck will be a single-lane concrete deck supported by four wide-flange main beams. The main beams will span the width of the creek and bear on cast-in-place concrete abutments bearing below grade, outside of the creek channel. DOT compliant guardrails will border the bridge deck and a new security gate will span the access road leading to the bridge.
Posted Date
Mar 15, 2026
Due Date
Apr 10, 2026
Release: Mar 15, 2026
Trout Unlimited
Close: Apr 10, 2026
Removal of a culvert restricting fish passage, the restoration of the creek channel, and the construction of a new bridge to access properties previously served by the roadway over the culvert. The existing 48" dia. Corrugated metal culvert is approx. 26' in length. A scour pool has developed on both ends of the culvert. The selected contractor will remove the culvert, fill the scour pools with materials specified in the construction documents, restore the stream bed by removing fill placed during the culvert installation and placing new clean material in accordance with the plans and specifications, and construct the bridge to span the newly restored channel. The new 45' x 14' bridge will consist of a single span from bank to bank of beaver creek. The travelled bridge deck will be a single-lane concrete deck supported by four wide-flange main beams. The main beams will span the width of the creek and bear on cast-in-place concrete abutments bearing below grade, outside of the creek channel. DOT compliant guardrails will border the bridge deck and a new security gate will span the access road leading to the bridge.
AvailableTrout Unlimited
Road private culvert replacement.
Posted Date
Jun 9, 2025
Due Date
Jun 27, 2025
Release: Jun 9, 2025
Trout Unlimited
Close: Jun 27, 2025
Road private culvert replacement.
Trout Unlimited
Provide helicopter transport and placement of restoration materials for 1.35 miles of stream restoration. Item 1.a requires up to 10,000 lift capacity.
Posted Date
May 19, 2025
Due Date
Jun 5, 2025
Release: May 19, 2025
Trout Unlimited
Close: Jun 5, 2025
Provide helicopter transport and placement of restoration materials for 1.35 miles of stream restoration. Item 1.a requires up to 10,000 lift capacity.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Trout Unlimited's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database