Learn more →Work consist of install approximately 11,000 LF of 16" c909 PVC waterline within the rightof-way, install approx. 22,000 LF of two 3" schedule 90 PVC conduits in a shared trench with the waterline, perform open-cut and trenchless (bore) installation methods, including all necessary fittings, connections, and restoration, maintain continuous water service during construction.
Posted Date
Nov 27, 2025
Due Date
Jan 8, 2026
Release: Nov 27, 2025
Close: Jan 8, 2026
Work consist of install approximately 11,000 LF of 16" c909 PVC waterline within the rightof-way, install approx. 22,000 LF of two 3" schedule 90 PVC conduits in a shared trench with the waterline, perform open-cut and trenchless (bore) installation methods, including all necessary fittings, connections, and restoration, maintain continuous water service during construction.
AvailableProvide exterior block fencing materials & installation. Removing and hauling away existing fencing. Installing new fencing. Repairing existing fencing.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
Close: Dec 4, 2025
Provide exterior block fencing materials & installation. Removing and hauling away existing fencing. Installing new fencing. Repairing existing fencing.
Wok includes 6,000 CY earthwork for open channels and retention basins; 104 CY riprap construction, dumped - angular d50=8"; 75 CY riprap construction, dumped - angular d50=12"; 29,000 SY subgrade preparation; 169 SY aggregate base course - 4" thick; 214 SY aggregate base course - 10" thick; 214 SY asphalt concrete pavement - type a 1/2" mix - 1.5" thick; 21,116 SY asphalt concrete pavement - type a 1/2" mix - 2" thick; 214 SY asphalt concrete pavement - type a 3/4" mix - 2. 5" thick; 20,913 SY asphalt concrete pavement - type a 3/4" mix - 3" thick; 10 ton tack coat; 2,721 LF sawcut asphaltic concrete pavement. See outside link.
Posted Date
Oct 30, 2025
Due Date
Dec 30, 2025
Release: Oct 30, 2025
Close: Dec 30, 2025
Wok includes 6,000 CY earthwork for open channels and retention basins; 104 CY riprap construction, dumped - angular d50=8"; 75 CY riprap construction, dumped - angular d50=12"; 29,000 SY subgrade preparation; 169 SY aggregate base course - 4" thick; 214 SY aggregate base course - 10" thick; 214 SY asphalt concrete pavement - type a 1/2" mix - 1.5" thick; 21,116 SY asphalt concrete pavement - type a 1/2" mix - 2" thick; 214 SY asphalt concrete pavement - type a 3/4" mix - 2. 5" thick; 20,913 SY asphalt concrete pavement - type a 3/4" mix - 3" thick; 10 ton tack coat; 2,721 LF sawcut asphaltic concrete pavement. See outside link.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis