Discover Opportunities months before the RFP drops
Learn more →Competitive sealed proposal to construct a new downtown parking lot and perform improvements to the existing alley east of S. Main Street (between W. 3rd St and Broadway). Scope includes furnishing all labor, equipment and materials for demolition, mobilization, asphalt and reinforced concrete pavement, curb & gutter, sidewalks, drainage structures (drop and curb inlets, riprap, pipe connections), stormwater pollution prevention, trench safety, bollards, ADA ramps, and related site work. Bid requirements include a 5% bid guaranty, Performance Bond 115%, Payment Bond 100%, and a 100% Maintenance Bond for two years. Engineer's estimate: $329,488.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
Competitive sealed proposal to construct a new downtown parking lot and perform improvements to the existing alley east of S. Main Street (between W. 3rd St and Broadway). Scope includes furnishing all labor, equipment and materials for demolition, mobilization, asphalt and reinforced concrete pavement, curb & gutter, sidewalks, drainage structures (drop and curb inlets, riprap, pipe connections), stormwater pollution prevention, trench safety, bollards, ADA ramps, and related site work. Bid requirements include a 5% bid guaranty, Performance Bond 115%, Payment Bond 100%, and a 100% Maintenance Bond for two years. Engineer's estimate: $329,488.
AvailableThe project consists of construction of the new parking lot and improvements. Work includes 11 LF remove and dispose 5-foot x 3-foot rcb, 39 SY remove and dispose concrete pavement, 25 SY remove and dispose concrete sidewalk, 290 SY remove and dispose asphalt pavement, 84 SY remove and dispose gravel, 4 LF remove and replace 6-foot tall wood fence. See outside link.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
The project consists of construction of the new parking lot and improvements. Work includes 11 LF remove and dispose 5-foot x 3-foot rcb, 39 SY remove and dispose concrete pavement, 25 SY remove and dispose concrete sidewalk, 290 SY remove and dispose asphalt pavement, 84 SY remove and dispose gravel, 4 LF remove and replace 6-foot tall wood fence. See outside link.
AvailableThe project consists of construction of the new parking lot and improvements. Work includes 11 LF remove and dispose 5-foot x 3-foot rcb, 39 SY remove and dispose concrete pavement, 25 SY remove and dispose concrete sidewalk, 290 SY remove and dispose asphalt pavement, 84 SY remove and dispose gravel, 4 LF remove and replace 6-foot tall wood fence. See outside link.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
The project consists of construction of the new parking lot and improvements. Work includes 11 LF remove and dispose 5-foot x 3-foot rcb, 39 SY remove and dispose concrete pavement, 25 SY remove and dispose concrete sidewalk, 290 SY remove and dispose asphalt pavement, 84 SY remove and dispose gravel, 4 LF remove and replace 6-foot tall wood fence. See outside link.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis