Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of construction of the new parking lot and improvements. Work includes 11 LF remove and dispose 5-foot x 3-foot rcb, 39 SY remove and dispose concrete pavement, 25 SY remove and dispose concrete sidewalk, 290 SY remove and dispose asphalt pavement, 84 SY remove and dispose gravel, 4 LF remove and replace 6-foot tall wood fence. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of construction of the new parking lot and improvements. Work includes 11 LF remove and dispose 5-foot x 3-foot rcb, 39 SY remove and dispose concrete pavement, 25 SY remove and dispose concrete sidewalk, 290 SY remove and dispose asphalt pavement, 84 SY remove and dispose gravel, 4 LF remove and replace 6-foot tall wood fence. See outside link.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
The project consists of construction of the new parking lot and improvements. Work includes 11 LF remove and dispose 5-foot x 3-foot rcb, 39 SY remove and dispose concrete pavement, 25 SY remove and dispose concrete sidewalk, 290 SY remove and dispose asphalt pavement, 84 SY remove and dispose gravel, 4 LF remove and replace 6-foot tall wood fence. See outside link.
Premium
Access the largest public sector contact database
Competitive sealed proposal to construct a new downtown parking lot and perform improvements to the existing alley east of S. Main Street (between W. 3rd St and Broadway). Scope includes furnishing all labor, equipment and materials for demolition, mobilization, asphalt and reinforced concrete pavement, curb & gutter, sidewalks, drainage structures (drop and curb inlets, riprap, pipe connections), stormwater pollution prevention, trench safety, bollards, ADA ramps, and related site work. Bid requirements include a 5% bid guaranty, Performance Bond 115%, Payment Bond 100%, and a 100% Maintenance Bond for two years. Engineer's estimate: $329,488.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
Competitive sealed proposal to construct a new downtown parking lot and perform improvements to the existing alley east of S. Main Street (between W. 3rd St and Broadway). Scope includes furnishing all labor, equipment and materials for demolition, mobilization, asphalt and reinforced concrete pavement, curb & gutter, sidewalks, drainage structures (drop and curb inlets, riprap, pipe connections), stormwater pollution prevention, trench safety, bollards, ADA ramps, and related site work. Bid requirements include a 5% bid guaranty, Performance Bond 115%, Payment Bond 100%, and a 100% Maintenance Bond for two years. Engineer's estimate: $329,488.
AvailableParking lot improvements work includes 1,400 SY grade and shape base; 970 SY of 6" removal and replacement PC concrete; 330 SY of 8" removal and replacement of PC concrete; 250 TN limestone base installation; 400 LF of full depth sawcut; 350 LF of barrier curb ("tack-on" type); see attached bid ad.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
Parking lot improvements work includes 1,400 SY grade and shape base; 970 SY of 6" removal and replacement PC concrete; 330 SY of 8" removal and replacement of PC concrete; 250 TN limestone base installation; 400 LF of full depth sawcut; 350 LF of barrier curb ("tack-on" type); see attached bid ad.
AvailableWork includes parking lot striping.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
Work includes parking lot striping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis