Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Nashville's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
President, Town Park Commission
President, Utility Service Board
Town Manager
Town Marshal
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Nashville
Snow removal air conditioning and heating repair plumbing building repair storm drain repair auto repair sidewalk repair tree maintenance pest control material hauling striping septic and wastewater hauling wastewater excavation wastewater pump / lift station repair water excavation water pump / booster station repair.
Posted Date
Jan 7, 2026
Due Date
Feb 12, 2026
Release: Jan 7, 2026
Town of Nashville
Close: Feb 12, 2026
Snow removal air conditioning and heating repair plumbing building repair storm drain repair auto repair sidewalk repair tree maintenance pest control material hauling striping septic and wastewater hauling wastewater excavation wastewater pump / lift station repair water excavation water pump / booster station repair.
AvailableTown of Nashville
Applying for a stormwater utility planning grant to conduct an impervious area study that will strengthen the towns green infrastructure. This study will build upon the existing stormwater master plan and provide the foundation for establishing fair and sustainable stormwater rates for residents.
Posted Date
Sep 24, 2025
Due Date
Oct 10, 2025
Release: Sep 24, 2025
Town of Nashville
Close: Oct 10, 2025
Applying for a stormwater utility planning grant to conduct an impervious area study that will strengthen the towns green infrastructure. This study will build upon the existing stormwater master plan and provide the foundation for establishing fair and sustainable stormwater rates for residents.
Salt Creek Estates
Project includes the development and construction of a new water treatment plant. The private infrastructure to be developed and constructed may include a new engineered building with new water treatment structures and equipment, and the selective demolition of the existing water treatment plant.
Posted Date
May 26, 2025
Due Date
Jun 25, 2025
Release: May 26, 2025
Salt Creek Estates
Close: Jun 25, 2025
Project includes the development and construction of a new water treatment plant. The private infrastructure to be developed and constructed may include a new engineered building with new water treatment structures and equipment, and the selective demolition of the existing water treatment plant.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.