Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Linn
Work consists of the removal of a section of existing retaining wall and installation of a 50 LF section of proposed retaining wall, approx 55 LF of 4" RCP, a cast-in-place inlet structure, 45 LF of 2.5" HDPE, a split rail fence, clearing and grubbing, tree removal, earthwork, tree installation, and riprap while providing adequate erosion control and restoration measures.
Posted Date
Jun 24, 2026
Due Date
Jul 7, 2026
Release: Jun 24, 2026
Town of Linn
Close: Jul 7, 2026
Work consists of the removal of a section of existing retaining wall and installation of a 50 LF section of proposed retaining wall, approx 55 LF of 4" RCP, a cast-in-place inlet structure, 45 LF of 2.5" HDPE, a split rail fence, clearing and grubbing, tree removal, earthwork, tree installation, and riprap while providing adequate erosion control and restoration measures.
AvailableTown of Linn
Scope of work consists of regrading the existing ditch lines, the installation of 3 stormwater inlet structures with 578 LF of HDPE pipe, a cast-in-place outlet structure, and four permanent stone ditch checks. Erosion control and dewatering will be required as part of the project.
Posted Date
Mar 11, 2026
Due Date
Apr 3, 2026
Release: Mar 11, 2026
Town of Linn
Close: Apr 3, 2026
Scope of work consists of regrading the existing ditch lines, the installation of 3 stormwater inlet structures with 578 LF of HDPE pipe, a cast-in-place outlet structure, and four permanent stone ditch checks. Erosion control and dewatering will be required as part of the project.
Town of Linn
2026 pavement resurfacing: mill butt joints (including project and driveway butt joints); 2.5" asphalt milling; epoxy double yellow centerline; remove existing asphalt pavement 5" depth.
Posted Date
Jan 20, 2026
Due Date
Feb 27, 2026
Release: Jan 20, 2026
Town of Linn
Close: Feb 27, 2026
2026 pavement resurfacing: mill butt joints (including project and driveway butt joints); 2.5" asphalt milling; epoxy double yellow centerline; remove existing asphalt pavement 5" depth.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Do not pursue; pivot immediately to a cooperative path.
Coops: Lead with a cooperative purchase via Sourcewell to buy quickly on a pre-competed contract.
Town of Linn (WI): No evidence of a workable sole source path. Deprioritize this route—attempts are likely to be rejected under a rigid framework and push the purchase into a formal, high-barrier bid.
Board meetings and strategic plans from Town of Linn
The Town of Linn's Comprehensive Plan focuses on economic development by anticipating change, diversifying industries, and redefining opportunities. It aims to improve the standard of living and economic health of the community through strategic actions involving human capital development, infrastructure enhancement, regional competitiveness, environmental sustainability, and social inclusion. The plan emphasizes supporting existing local businesses, encouraging new start-ups, and fostering economic diversity through quality agricultural, commercial, light manufacturing, high-tech, and home-based industries that align with the township's character and environmental values.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Linn's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge