Learn more →Installation of approximately 2,450 SY of 5” Concrete Pathway, 2,695 SY of 4” Grading “W” Base and other miscellaneous items associated with concrete pathway installation.
Posted Date
Dec 1, 2025
Due Date
Dec 19, 2025
Release: Dec 1, 2025
Close: Dec 19, 2025
Installation of approximately 2,450 SY of 5” Concrete Pathway, 2,695 SY of 4” Grading “W” Base and other miscellaneous items associated with concrete pathway installation.
AvailablePurchase of two 2025 or newer ford police interceptor utility awd with the trade of a 2016 dodge charger and a 2012 ford fusion.
Posted Date
Jul 19, 2025
Due Date
Aug 6, 2025
Release: Jul 19, 2025
Close: Aug 6, 2025
Purchase of two 2025 or newer ford police interceptor utility awd with the trade of a 2016 dodge charger and a 2012 ford fusion.
Work includes installation of approx. 2,700 LF 8" sanitary, 1,260 LF 8" water, 1,960 LF 18" water, 200 LF 4.5' x10' precast box culvert, 8,000 LF concrete curb and gutter, 18,500 SY of base course and asphalt surfacing, and other miscellaneous items. Mobilization; force account; remove and replace topsoil; 1,170 sy remove existing surfacing; unclassified excavation; 2,700 LF 8" pvc sanitary sewer; 12 EA sanitary sewer manhole; 9 EA 4" pvc sanitary sewer service; 1 EA 6" pvc sanitary sewer service; 1 EA connect to existing sewer; 1,360 LF 8" pvc water pipe; 11 EA fire hydrant assembly; 13 EA 2" pe water service; 13 EA 4" pvc water service; 120 LF 27" steel casing; 1 EA connect to existing water; 192 LF remove existing 38" x 60" culvert; 172 CY culvert subexcavation. See attached file.
Posted Date
May 2, 2025
Due Date
Jun 17, 2025
Release: May 2, 2025
Close: Jun 17, 2025
Work includes installation of approx. 2,700 LF 8" sanitary, 1,260 LF 8" water, 1,960 LF 18" water, 200 LF 4.5' x10' precast box culvert, 8,000 LF concrete curb and gutter, 18,500 SY of base course and asphalt surfacing, and other miscellaneous items. Mobilization; force account; remove and replace topsoil; 1,170 sy remove existing surfacing; unclassified excavation; 2,700 LF 8" pvc sanitary sewer; 12 EA sanitary sewer manhole; 9 EA 4" pvc sanitary sewer service; 1 EA 6" pvc sanitary sewer service; 1 EA connect to existing sewer; 1,360 LF 8" pvc water pipe; 11 EA fire hydrant assembly; 13 EA 2" pe water service; 13 EA 4" pvc water service; 120 LF 27" steel casing; 1 EA connect to existing water; 192 LF remove existing 38" x 60" culvert; 172 CY culvert subexcavation. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis