Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Burke
The project consists of the pulverizing and repaving of Daentl Road & Daentl Service Road. The project scope includes replacement of asphalt pavement, curb replacement, culvert installation approx 50 LF of 19"x30" RCP Culvert; 14 EA of 19"x30" RCP Endwall, Class III; 60 LF of 18" CMP Culvert Pipe including endwalls; ditch grading, restoration, and pavement marking.
Posted Date
May 28, 2026
Due Date
Jun 19, 2026
Release: May 28, 2026
Town of Burke
Close: Jun 19, 2026
The project consists of the pulverizing and repaving of Daentl Road & Daentl Service Road. The project scope includes replacement of asphalt pavement, curb replacement, culvert installation approx 50 LF of 19"x30" RCP Culvert; 14 EA of 19"x30" RCP Endwall, Class III; 60 LF of 18" CMP Culvert Pipe including endwalls; ditch grading, restoration, and pavement marking.
AvailableTown of Burke
Work includes approx. 55 LF of saw cut; 70 CY of undercut; 23 TN of asphalt pavement; 175 SY of 6" concrete pavement; 300 SY of seeding, fertilizer, mulch; 150 LF of sediment log; 200 TN of riprap.
Posted Date
Apr 29, 2026
Due Date
May 18, 2026
Release: Apr 29, 2026
Town of Burke
Close: May 18, 2026
Work includes approx. 55 LF of saw cut; 70 CY of undercut; 23 TN of asphalt pavement; 175 SY of 6" concrete pavement; 300 SY of seeding, fertilizer, mulch; 150 LF of sediment log; 200 TN of riprap.
Town of Burke
Project consists of the milling and repaving of pepsi way. The project scope includes replacement of asphalt pavement, curb replacement, minor erosion control, and pavement marking.
Posted Date
May 23, 2025
Due Date
Jun 16, 2025
Release: May 23, 2025
Town of Burke
Close: Jun 16, 2025
Project consists of the milling and repaving of pepsi way. The project scope includes replacement of asphalt pavement, curb replacement, minor erosion control, and pavement marking.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; pivot to a cooperative purchase (use their Sourcewell membership) to meet competitive requirements without issuing a formal bid.
Coops: Ask about using Sourcewell or State of Wisconsin cooperative contracts.
Town of Burke (WI) adheres strictly to Wisconsin Statute 60.47 and there is no evidence of sole source awards. Deprioritize sole source.
Board meetings and strategic plans from Town of Burke
The commission reviewed the site plan application submitted by Devon/PGUV, LLC. Discussion included enlarging outdoor storage space, the potential use of a holding tank for wastewater due to costs associated with extending sanitary sewer lines, proposed changes to building colors, and landscaping plans for deer-resistant tree planting. The commission voted to recommend an amendment to a previous resolution regarding screening requirements and approved the site plan and the use of a holding tank.
The commission reviewed and recommended approval for a two-lot Certified Survey Map and rezone request. Additionally, the commission examined a site plan and conditional use application for a commercial project, which was deferred to a later meeting pending further discussion and a public hearing. A report on previous amendments to a conditional use permit was also provided.
The board meeting agenda includes public hearings regarding a rezoning and land division application and a conditional use permit for a gas station and convenience store. New business items involve considering a rezone and certified survey map application, reviewing a variance request for multiple driveway access points, and appointing a Weed Commissioner. Additionally, the meeting will feature reports from the Plan Commission, Parks Committee, ETZ Committee, NECC, and administration and public works departments.
The board addressed public inquiries regarding driveway configurations and traffic concerns on Rattmann Road. Agenda items included the appointment of a new member to the Parks Advisory Committee and the approval of an amendment to the Resolution for the PGUV, LLC conditional use permit, specifically regarding screened outside storage. Committee reports were provided for the Plan Commission, Parks Committee, ETZ Committee, and NECC, along with departmental updates from the Administrator and Public Works.
The committee discussed the Parks and Open Space Plan, including the purchase of new park benches, the status of playground and toddler equipment, and infrastructure projects such as crosswalks, pond aerators, and culvert installations. Additional items addressed included the potential for park 'book boxes', shelter maintenance, new signage for prairie spaces, and the evaluation of failed court repairs. The committee also initiated planning discussions for the next multi-year Parks and Open Space cycle required for upcoming grant applications.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Burke's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge