Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Briarcliff
Work includes asphalt road improvements consisting of approx. 745 to 800 tons of 2" asphalt overlay. Work shall include furnishing all labor, materials, equipment, and incidentals necessary to complete the asphalt overlay, including surface preparation as needed, placement, and compaction.
Posted Date
Mar 25, 2026
Due Date
Apr 3, 2026
Release: Mar 25, 2026
Town of Briarcliff
Close: Apr 3, 2026
Work includes asphalt road improvements consisting of approx. 745 to 800 tons of 2" asphalt overlay. Work shall include furnishing all labor, materials, equipment, and incidentals necessary to complete the asphalt overlay, including surface preparation as needed, placement, and compaction.
AvailableTown of Briarcliff
Work includes grade and cement walking trail by the city's pond area and walkway to the dock. The damaged trail area in need of repair is 2, 977.11' long by 6' wide. The walkway to the dock is 16' x 4' wide.
Posted Date
Mar 30, 2025
Due Date
Apr 26, 2025
Release: Mar 30, 2025
Town of Briarcliff
Close: Apr 26, 2025
Work includes grade and cement walking trail by the city's pond area and walkway to the dock. The damaged trail area in need of repair is 2, 977.11' long by 6' wide. The walkway to the dock is 16' x 4' wide.
Town of Briarcliff
Work includes replace or repair the floating dock and bridge by the city's pond area. The damaged floating dock in need of repair is 12' x 24'. The bridge is 14' x 3' wide.
Posted Date
Mar 30, 2025
Due Date
Apr 26, 2025
Release: Mar 30, 2025
Town of Briarcliff
Close: Apr 26, 2025
Work includes replace or repair the floating dock and bridge by the city's pond area. The damaged floating dock in need of repair is 12' x 24'. The bridge is 14' x 3' wide.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Town of Briarcliff's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database