Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Toledo Zoo Administration Building
Public Address System Equipment as shown in the following: Section 1: Distributed Processing & Software Architecture (Symetrix Focus) 1.1 Software-Defined Architecture: The primary audio processing platform must utilize a software-defined, distributed architecture running a native, embedded operating system across network endpoints (equivalent to Symetrix CognioOS). Standard, hardware-centric centralized DSP frames, or core-locked processing architectures shall not be accepted. 1.2 Native Ecosystem Integration; Section 3: Shall be equivalent to Symetrix CognioOS
Posted Date
Jul 9, 2026
Due Date
Jul 16, 2026
Release: Jul 9, 2026
Toledo Zoo Administration Building
Close: Jul 16, 2026
Public Address System Equipment as shown in the following: Section 1: Distributed Processing & Software Architecture (Symetrix Focus) 1.1 Software-Defined Architecture: The primary audio processing platform must utilize a software-defined, distributed architecture running a native, embedded operating system across network endpoints (equivalent to Symetrix CognioOS). Standard, hardware-centric centralized DSP frames, or core-locked processing architectures shall not be accepted. 1.2 Native Ecosystem Integration; Section 3: Shall be equivalent to Symetrix CognioOS
AvailableToledo Zoo Administration Building
Consist of a perimeter security camera & radar installation, 8 surveillance cameras and 1 surveillance radar unit.
Posted Date
Feb 27, 2026
Due Date
Mar 23, 2026
Release: Feb 27, 2026
Toledo Zoo Administration Building
Close: Mar 23, 2026
Consist of a perimeter security camera & radar installation, 8 surveillance cameras and 1 surveillance radar unit.
Toledo Zoo Administration Building
Parking lot access project. Work shall consist of site prep, sidewalk prep and concrete, top dressing and reseeding and gate fabrication.
Posted Date
Aug 11, 2025
Due Date
Aug 21, 2025
Release: Aug 11, 2025
Toledo Zoo Administration Building
Close: Aug 21, 2025
Parking lot access project. Work shall consist of site prep, sidewalk prep and concrete, top dressing and reseeding and gate fabrication.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge