East Morgan Street & Fay Avenue Water Main Replacement – Project W2026 RFP
Aug 28, 2026
Closes
Oct 6, 2026
Replacement of approx., 1,306 LF of existing 6" water line with proposed C900 PVC water line, including connections, valves, hydrants, and fittings. Work also includes the replacement of approx., 679 LF of existing 12" water line with 12" C900 PVC, including connections, valves, hydrants, and fittings. Owner to provide all permanently installed construction materials.
