Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Tilden Township
Base Repair 4" 25MM 3-30 ESALS PG-64-62 150 SY; Scratch 120 LB/SY 9.5mm 0-, 3 ESALS PG-64-22 SRL "M"; Manhole Risers; Park parking Lot 1650 SY Mill 4" Base Course 4" 25mm Wearing course 1.5" 9.5mm.
Posted Date
Mar 16, 2026
Due Date
Apr 7, 2026
Release: Mar 16, 2026
Tilden Township
Close: Apr 7, 2026
Base Repair 4" 25MM 3-30 ESALS PG-64-62 150 SY; Scratch 120 LB/SY 9.5mm 0-, 3 ESALS PG-64-22 SRL "M"; Manhole Risers; Park parking Lot 1650 SY Mill 4" Base Course 4" 25mm Wearing course 1.5" 9.5mm.
AvailableTilden Township
Tilden Township (Berks County, PA) is auctioning a 1999 Mack RD688S tandem axle dump truck with an 11' plow and spreader on Municibid. The vehicle is sold as-is, with pickup required at 874 Hex Highway, Hamburg, PA 19526, and payment by certified check or cash payable to Tilden Township. The auction is currently active and is scheduled to close on March 27, 2026.
Posted Date
-
Due Date
Mar 27, 2026
Release: -
Tilden Township
Close: Mar 27, 2026
Tilden Township (Berks County, PA) is auctioning a 1999 Mack RD688S tandem axle dump truck with an 11' plow and spreader on Municibid. The vehicle is sold as-is, with pickup required at 874 Hex Highway, Hamburg, PA 19526, and payment by certified check or cash payable to Tilden Township. The auction is currently active and is scheduled to close on March 27, 2026.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $10,000, use sole source.
Coops: Lead with a purchase via COSTARS, Sourcewell, or the Berks County cooperative to bypass formal bidding.
Entity: Tilden Township, PA.
Policy allows waiving bid requirements for a single known supplier, but there’s no evidence this is used in practice; treat as high-friction, low-probability.
Board meetings and strategic plans from Tilden Township
The meeting included discussions on the amended Wawa land development plan, which proposes an addition of 1,095 S.F. to include a salad bar and ADA improvements. Concerns were raised regarding truck parking accommodations, traffic flow on Lowland Road, and the need for potential left/right turn lane modifications. The commission reviewed the township engineer's comments detailing required steps, including Berks County Planning Commission review, submission procedures, and requested waivers for scale, wetlands survey, and stormwater analysis. A motion was made to recommend approval for five specific waivers and to recommend conditional approval for the Wawa plan contingent upon satisfaction of the township engineer's comments concerning ingress/egress at the Lowland Road intersection. The commission also acknowledged an extension granted by the Board of Supervisors for the Walnut Acres Subdivision Plan until October 16, 2019, and reviewed updated red-lined SALDO regulations.
The meeting included public participation where residents voiced concerns regarding a potential warehouse development along Pine Road concerning traffic increases and stormwater management. The commission reviewed technical comments from the township engineer regarding the Cabela's Outparcel 'I' (Hotel) preliminary/final plan submission, focusing extensively on stormwater management, sewage tapping fees, and subdivision ordinance requirements. Specific technical issues included flow computation concurrence, inadequate Erosion and Sedimentation Control Plans, inconsistencies in peak discharge rates, and required certifications and agreements. The preliminary/final plan for the hotel project was recommended for denial unless the developer submits a written request for an extension by November 15, 2017, to address the engineering comments. Additionally, the commission reviewed a proposed ordinance establishing a "Logistics Park" overlay district and established the 2018 meeting schedule to be held on the third Tuesday of each month at 7:30 P.M.
The meeting included discussions with a representative of Contentment Farms regarding comments received from Carbon Engineering, Inc. Specific discussion points related to the farm included right-of-way/property line issues, plan updates, the removal of drypits, wetlands on neighboring property, and proposed grading for a Detention Basin. The commission voted to recommend to the Board of Supervisors the granting of a waiver concerning hydric soils (HO type) for lots 10, 11, and 12, contingent on adding a specific note to the plan regarding construction restrictions. A request for a second waiver, involving a grade maximum near the intersection of Linden Drive and Hex Highway, was withdrawn. Furthermore, a motion was made to recommend the adoption of a proposed amendment to the SALDO Ordinance regarding the requirement for Traffic Studies.
The Tilden Township Planning Commission meeting addressed several items, including the approval of the September 21, 2010 and January 19, 2010 meeting minutes. A key action taken was recommending to the Board of Supervisors that a 90-day time extension until March 12, 2011 be granted for the Contentment Farms Subdivision. Discussion regarding the Walnut Acres Sketch Plan involved reviewing comments from Carbon Engineering, Inc., concerning issues such as on-site septic systems, drainage easement for Mill Creek, wetlands, stormwater control, steep grades, street right-of-ways, lot depths, and sight distance problems. The Commission concluded that the proposed number of lots might be too high without significant owner expenditure and noted that specific comments from the engineering firm would be addressed in writing at the November meeting. Other business included a general discussion of zoning comments and changes from the Zoning Officer regarding issues like weeds, yard sales, and roofing, with no formal action taken.
The meeting commenced with the pledge of allegiance. Key discussions included the Township Engineer's report, noting that the owner of Aldi was contacted regarding necessary documentation to be submitted to the township, and that the engineer will submit a status report on SALDO updates to the Board of Supervisors. Members also continued the review and discussion of the Township Engineer's proposed SALDO updates, specifically reviewing pages 14 through 24.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Tilden Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Fire Chief (Union Fire Company No. 1 of Hamburg / Hamburg Fire Company – contracted fire service for Tilden Township)
Premium
Access the largest public sector contact database