Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
The Belton Park Recreation
Project consists of the complete removal of the existing flooring system and preparation of the underlying substrate to support the installation of a new, high-performance flooring system in the Fitness Area.
Posted Date
-
Due Date
Jun 11, 2026
Release: -
The Belton Park Recreation
Close: Jun 11, 2026
Project consists of the complete removal of the existing flooring system and preparation of the underlying substrate to support the installation of a new, high-performance flooring system in the Fitness Area.
AvailableThe Belton Park Recreation
Purchase of quantity 5 - vapor alpine runner incline trainer w/ unite led console w/step platform and 220-volt kit. ; quantity 4 - matrix performance treadmills w/ 16" touch console; quantity 2 - matrix performance climbmill w/ premium led console; quantity 1 - matrix performance elliptical w/premium led console; quantity 1 - matrix magnum smith machine, counter-balanced.
Posted Date
Apr 6, 2026
Due Date
Apr 14, 2026
Release: Apr 6, 2026
The Belton Park Recreation
Close: Apr 14, 2026
Purchase of quantity 5 - vapor alpine runner incline trainer w/ unite led console w/step platform and 220-volt kit. ; quantity 4 - matrix performance treadmills w/ 16" touch console; quantity 2 - matrix performance climbmill w/ premium led console; quantity 1 - matrix performance elliptical w/premium led console; quantity 1 - matrix magnum smith machine, counter-balanced.
The Belton Park Recreation
Purchase and delivery of lighting materials for the indoor pool area type of lighting: brand: spi lighting model: echo round 9. 0 led - eiw12248 lk216 120-277v quantity: 25 housing color: white. Natatorium construction option-suitable for high-moisture, corrosive, and chlorinated environments ul-listed or equivalent for damp/wet locations energy-efficient led design minimum lumen output: 28,188 color temperature: 3500k. See attached file.
Posted Date
Apr 2, 2026
Due Date
Apr 10, 2026
Release: Apr 2, 2026
The Belton Park Recreation
Close: Apr 10, 2026
Purchase and delivery of lighting materials for the indoor pool area type of lighting: brand: spi lighting model: echo round 9. 0 led - eiw12248 lk216 120-277v quantity: 25 housing color: white. Natatorium construction option-suitable for high-moisture, corrosive, and chlorinated environments ul-listed or equivalent for damp/wet locations energy-efficient led design minimum lumen output: 28,188 color temperature: 3500k. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge