Learn more →Work includes 1 EA patch/repair damage to the exterior insulation and finish system (efis) on both buildings. Remove only damaged portions of the efis system in its entirety to concrete masonry unit substrate and patch/repair efis in-kind to match adjacent surfaces to remain; 1 EA inspect and investigate cause of through wall water intrusion at aluminum windows. Repair or replace aluminum windows, as required, to eliminate water intrusion into buildings. Provide and install metal flashing at exterior sills of aluminum windows to slope provide positive slope over the face of the building; 1 EA remove and replace exterior sealant at the perimeter of windows and doors.
Posted Date
Nov 7, 2025
Due Date
Dec 19, 2025
Release: Nov 7, 2025
Close: Dec 19, 2025
Work includes 1 EA patch/repair damage to the exterior insulation and finish system (efis) on both buildings. Remove only damaged portions of the efis system in its entirety to concrete masonry unit substrate and patch/repair efis in-kind to match adjacent surfaces to remain; 1 EA inspect and investigate cause of through wall water intrusion at aluminum windows. Repair or replace aluminum windows, as required, to eliminate water intrusion into buildings. Provide and install metal flashing at exterior sills of aluminum windows to slope provide positive slope over the face of the building; 1 EA remove and replace exterior sealant at the perimeter of windows and doors.
AvailableTo provide an efficient and cost-effective RTCS that includes Design, integration, implementation, and Operations and Maintenance. The RTCS shall include Roadside Systems and a Roadway Support System (RSS) to provide complete and properly formed transactions ready for processing by the Authority's new Operational Back Office System (OBOS), which is being procured by the Authority separately. The successful Proposer shall procure, furnish, Design, test, install, and maintain the toll facilities, including all aspects required to create complete Electronic Toll Collection (ETC) Transactions for SunPass and Interoperable Transponders, and Image-based Transactions (IBT) with full license plate data, and transmit the transactions and images to the OBOS. The RTCS shall use the latest proven technology and shall be able to achieve the functional, technical, and Performance Requirements as further set forth in this Solicitation.
Posted Date
Oct 13, 2025
Due Date
Dec 12, 2025
Release: Oct 13, 2025
Close: Dec 12, 2025
To provide an efficient and cost-effective RTCS that includes Design, integration, implementation, and Operations and Maintenance. The RTCS shall include Roadside Systems and a Roadway Support System (RSS) to provide complete and properly formed transactions ready for processing by the Authority's new Operational Back Office System (OBOS), which is being procured by the Authority separately. The successful Proposer shall procure, furnish, Design, test, install, and maintain the toll facilities, including all aspects required to create complete Electronic Toll Collection (ETC) Transactions for SunPass and Interoperable Transponders, and Image-based Transactions (IBT) with full license plate data, and transmit the transactions and images to the OBOS. The RTCS shall use the latest proven technology and shall be able to achieve the functional, technical, and Performance Requirements as further set forth in this Solicitation.
Work includes mobilization, maintenance of traffic, sediment barrier 20 LF, inlet protection system 1 EA, clearing and grubbing, removal of existing concrete 102 SY, regular excavation 50 CY, embankment 32 CY, ditch clearing of large vegetation, ditch width up to 15' 20 LF, clean and reshape ditch, spread, ditch width up to 15' 60 LF, replace grate 1 EA, desilting pipe, 0- 24" 95 LF, mitered end section, round, 15" cd, pipe handrail - guiderail, aluminum 116 LF, concrete sidewalk and driveways, 4" 97 SY, fencing, wood fence, 5. 1-6. 0' 60 LF, performance turf, sod 80 SY, single column ground sign assembly, remove, 0706-1-3 raised pavement marker, type b 28 EA, painted pavement markings, final surface, thermoplastic, standard, white, 2-4 dotted guideline/ 6-10 gap extension, 6".
Posted Date
Oct 7, 2025
Due Date
Nov 19, 2025
Release: Oct 7, 2025
Close: Nov 19, 2025
Work includes mobilization, maintenance of traffic, sediment barrier 20 LF, inlet protection system 1 EA, clearing and grubbing, removal of existing concrete 102 SY, regular excavation 50 CY, embankment 32 CY, ditch clearing of large vegetation, ditch width up to 15' 20 LF, clean and reshape ditch, spread, ditch width up to 15' 60 LF, replace grate 1 EA, desilting pipe, 0- 24" 95 LF, mitered end section, round, 15" cd, pipe handrail - guiderail, aluminum 116 LF, concrete sidewalk and driveways, 4" 97 SY, fencing, wood fence, 5. 1-6. 0' 60 LF, performance turf, sod 80 SY, single column ground sign assembly, remove, 0706-1-3 raised pavement marker, type b 28 EA, painted pavement markings, final surface, thermoplastic, standard, white, 2-4 dotted guideline/ 6-10 gap extension, 6".
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis