Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Stone Environmental, Inc.
Clearing and grubbing, including approx. 31 trees greater than three inches diameter breast height (DBH), removal of two berms, installation of a strategic wood addition on river right upstream of the slope failure utilizing trees removed from the site or brought to the site that measure 20” or greater DBH, cut into logs measuring 44” or longer, installation of a bar buddy utilizing a 30” DBH ash tree located along the riverbank to be removed with its root ball attached, reconnection of an existing overflow channel along river left adjacent to the slope failure and placement of seed and mulch. The bar buddy installation will place approx. 20 cubic yards of woody debris in the river (fifteen of which will be below ordinary high water) and require additional ballasting utilizing the nine cubic yards of substrate excavated to facilitated overflow channel reconnection. The project includes minimal channel regrading.
Posted Date
Mar 2, 2026
Due Date
Mar 31, 2026
Release: Mar 2, 2026
Stone Environmental, Inc.
Close: Mar 31, 2026
Clearing and grubbing, including approx. 31 trees greater than three inches diameter breast height (DBH), removal of two berms, installation of a strategic wood addition on river right upstream of the slope failure utilizing trees removed from the site or brought to the site that measure 20” or greater DBH, cut into logs measuring 44” or longer, installation of a bar buddy utilizing a 30” DBH ash tree located along the riverbank to be removed with its root ball attached, reconnection of an existing overflow channel along river left adjacent to the slope failure and placement of seed and mulch. The bar buddy installation will place approx. 20 cubic yards of woody debris in the river (fifteen of which will be below ordinary high water) and require additional ballasting utilizing the nine cubic yards of substrate excavated to facilitated overflow channel reconnection. The project includes minimal channel regrading.
Stone Environmental, Inc.
Removal of the existing 45 LF, 7.5’ corrugated metal pipe arch, 50 LF concrete headwall, 17 LF concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20-FT span, 10-FT tall, and 45-FT long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
Posted Date
Mar 2, 2026
Due Date
Apr 30, 2026
Release: Mar 2, 2026
Stone Environmental, Inc.
Close: Apr 30, 2026
Removal of the existing 45 LF, 7.5’ corrugated metal pipe arch, 50 LF concrete headwall, 17 LF concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20-FT span, 10-FT tall, and 45-FT long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
AvailableStone Environmental, Inc.
Removal of the undersized 60” corrugated metal pipe along its buried length on Valley Road, stream realignment and restoration, installation of an 18-FT wide, 5-FT 9-in tall, and 45-FT long aluminum multi-plate pipe arch, headwalls and wingwalls, installation of channel bed material, bank rock and restoration of natural flow regime to Valley Brook.
Posted Date
Mar 2, 2026
Due Date
Apr 3, 2026
Release: Mar 2, 2026
Stone Environmental, Inc.
Close: Apr 3, 2026
Removal of the undersized 60” corrugated metal pipe along its buried length on Valley Road, stream realignment and restoration, installation of an 18-FT wide, 5-FT 9-in tall, and 45-FT long aluminum multi-plate pipe arch, headwalls and wingwalls, installation of channel bed material, bank rock and restoration of natural flow regime to Valley Brook.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Stone Environmental, Inc.'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database