Learn more →Work includes 85 CY drainage excavation; 500 LF temporary silt fencing; 15 CY class ii base course (crushed stone); 5 TN thin asphalt concrete (dense mix); 10 TN asphalt concrete; 400 SY riprap (30 lb, 18" thick); 10 LB seeding; 320 LF precast concrete piles (14"); 18. 8900 CY class a1 concrete (deck); 446 SF concrete finish (class 2 rubbed finish); 280 SF concrete approach slabs (cast-in-place); 66 LF saw cutting asphalt concrete pavement.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
Work includes 85 CY drainage excavation; 500 LF temporary silt fencing; 15 CY class ii base course (crushed stone); 5 TN thin asphalt concrete (dense mix); 10 TN asphalt concrete; 400 SY riprap (30 lb, 18" thick); 10 LB seeding; 320 LF precast concrete piles (14"); 18. 8900 CY class a1 concrete (deck); 446 SF concrete finish (class 2 rubbed finish); 280 SF concrete approach slabs (cast-in-place); 66 LF saw cutting asphalt concrete pavement.
AvailableWork includes 30 SY full depth asphalt patching (12")(level 1 superpave with 67-22); 168 LF storm drain pipe (15" equivlaent rcpa); 376 LF storm drain pipe (18" equivalent rcpa); 55 SY catch basin (cb-01); 55 SY remove/replace concrete driveway (6")(72'hr high early); 250 SY centipede sod; 3,000 LF cleaning existing ditches.
Posted Date
Nov 24, 2025
Due Date
Dec 9, 2025
Release: Nov 24, 2025
Close: Dec 9, 2025
Work includes 30 SY full depth asphalt patching (12")(level 1 superpave with 67-22); 168 LF storm drain pipe (15" equivlaent rcpa); 376 LF storm drain pipe (18" equivalent rcpa); 55 SY catch basin (cb-01); 55 SY remove/replace concrete driveway (6")(72'hr high early); 250 SY centipede sod; 3,000 LF cleaning existing ditches.
Work shall include constructing approximately 800' coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work shall include constructing approximately 800' coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis