Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work shall include constructing approximately 800' coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
Posted Date
Oct 26, 2025
Due Date
Jan 7, 2026
Release: Oct 26, 2025
Close: Jan 7, 2026
Work includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
Premium
Access the largest public sector contact database
Release: -
Close: Jan 13, 2026
Stadium lower levels restoration project.
AvailableComplete repair of the west breakwater. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approx. 45,000 CY of sediment will be dredged for access to the breakwater.
Posted Date
Apr 10, 2025
Due Date
Jan 19, 2026
Release: Apr 10, 2025
Close: Jan 19, 2026
Complete repair of the west breakwater. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approx. 45,000 CY of sediment will be dredged for access to the breakwater.
AvailableThe breakwater is critical for harbor protection and safe navigation. The project will restore the structural integrity of the breakwater, which has experienced significant deterioration due to age and environmental conditions.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
The breakwater is critical for harbor protection and safe navigation. The project will restore the structural integrity of the breakwater, which has experienced significant deterioration due to age and environmental conditions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis