Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Spicer Group, Inc.
Replacement of concrete sidewalk and both sides. 230 Ft. Curb and Gutter, Rem 780 SY Sidewalk, Rem 26 Cyd. Subgrade Undercutting, Type II 2 EA. Erosion Control, Filter bag 30 Ton. Aggregate base, Modified 50 SY. HMA Surface, Rem 12 Ton. Hand Patching 20 Syd. Driveway, Nonreinf Conc, 6" 160 Ft. Curb and Gutter, Conc, Det F4 40 Ft. Detectable Warning Surface 80 Ft. Curb Ramp Opening, Conc 6840 SF Sidewalk, Conc, 4"
Posted Date
Apr 24, 2026
Due Date
May 15, 2026
Release: Apr 24, 2026
Spicer Group, Inc.
Close: May 15, 2026
Replacement of concrete sidewalk and both sides. 230 Ft. Curb and Gutter, Rem 780 SY Sidewalk, Rem 26 Cyd. Subgrade Undercutting, Type II 2 EA. Erosion Control, Filter bag 30 Ton. Aggregate base, Modified 50 SY. HMA Surface, Rem 12 Ton. Hand Patching 20 Syd. Driveway, Nonreinf Conc, 6" 160 Ft. Curb and Gutter, Conc, Det F4 40 Ft. Detectable Warning Surface 80 Ft. Curb Ramp Opening, Conc 6840 SF Sidewalk, Conc, 4"
AvailableSpicer Group, Inc.
Street improvements by HMA Base Crushing & Shaping with 4 inches of HMA resurfacing, gravel shoulders, ADA sidewalk & ramp improvements with detectable warning surfaces & receivers, manhole and valve box adjustment with concrete collars and slope restoration.
Posted Date
Mar 9, 2026
Due Date
Apr 1, 2026
Release: Mar 9, 2026
Spicer Group, Inc.
Close: Apr 1, 2026
Street improvements by HMA Base Crushing & Shaping with 4 inches of HMA resurfacing, gravel shoulders, ADA sidewalk & ramp improvements with detectable warning surfaces & receivers, manhole and valve box adjustment with concrete collars and slope restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Spicer Group, Inc.'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database