Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Spanish Community Center
Project includes the installation of playground equipment for children ages 2-5 within a 26' x 40' outdoor area, including provision of a play structure with a minimum of seven (7) play activities such as climbing elements and slides, installation of pour-in-place rubber fall protection surfacing, preparation of sub-base and drainage, anchoring in accordance with manufacturer specifications, and all associated labor, materials, equipment, and cleanup.
Posted Date
Apr 1, 2026
Due Date
May 1, 2026
Release: Apr 1, 2026
Spanish Community Center
Close: May 1, 2026
Project includes the installation of playground equipment for children ages 2-5 within a 26' x 40' outdoor area, including provision of a play structure with a minimum of seven (7) play activities such as climbing elements and slides, installation of pour-in-place rubber fall protection surfacing, preparation of sub-base and drainage, anchoring in accordance with manufacturer specifications, and all associated labor, materials, equipment, and cleanup.
Spanish Community Center
This project includes the removal and replacement of six (6) existing metal frame windows and installation of new commercial aluminum single-hung windows. Windows must match the existing 48 dark bronze units in the main limestone building, including a blank third panel on 4 of the new units, any transition panels required, double-glazed energy efficient glass, and all aluminum trim inside and outside to complete the installation.
Posted Date
Apr 1, 2026
Due Date
May 27, 2026
Release: Apr 1, 2026
Spanish Community Center
Close: May 27, 2026
This project includes the removal and replacement of six (6) existing metal frame windows and installation of new commercial aluminum single-hung windows. Windows must match the existing 48 dark bronze units in the main limestone building, including a blank third panel on 4 of the new units, any transition panels required, double-glazed energy efficient glass, and all aluminum trim inside and outside to complete the installation.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge