Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
South Puget Sound Salmon Enhancement Group
Work includes: Remove timber fishway and culverts and backfilling restored area; install 30' span by 12' wide bridge and cast bridge footings; construct side road and grade current road to bridge elevation; excavate to create a new 260' long channel, install streambed gravel and cobble, deformable grade controls, large woody debris, and gravel augmentation; and create temporary access to site through private property, up to 1,10' depending on conditions.
Posted Date
May 6, 2026
Due Date
May 25, 2026
Release: May 6, 2026
South Puget Sound Salmon Enhancement Group
Close: May 25, 2026
Work includes: Remove timber fishway and culverts and backfilling restored area; install 30' span by 12' wide bridge and cast bridge footings; construct side road and grade current road to bridge elevation; excavate to create a new 260' long channel, install streambed gravel and cobble, deformable grade controls, large woody debris, and gravel augmentation; and create temporary access to site through private property, up to 1,10' depending on conditions.
AvailableSouth Puget Sound Salmon Enhancement Group
Add approx. 502,000 lbs of woody material by helicopter to create 12 jams located in Ohop Creek to improve habitat and reverse channel incision.
Posted Date
May 4, 2026
Due Date
May 27, 2026
Release: May 4, 2026
South Puget Sound Salmon Enhancement Group
Close: May 27, 2026
Add approx. 502,000 lbs of woody material by helicopter to create 12 jams located in Ohop Creek to improve habitat and reverse channel incision.
AvailableSouth Puget Sound Salmon Enhancement Group
Demolish sheet pile and wooden bulkheads, piling, concrete deck, and asphalt paving; procure and place lobe fill material, organics amendments, and lobe crest cobble on the south and west lobes and grade marsh channels; procure and place lobe fill material, organics amendments, and lobe crest cobble on the north lobe, grade blind and marsh channels, and fill to support stormwater outfall extensions; construct temp and final stormwater outfall pipe extensions; create access to west lobe through berm on the east side of SPI property and repair upon completion; establish staging area on SYC property; and manage stormwater and material staging.
Posted Date
May 4, 2026
Due Date
May 29, 2026
Release: May 4, 2026
South Puget Sound Salmon Enhancement Group
Close: May 29, 2026
Demolish sheet pile and wooden bulkheads, piling, concrete deck, and asphalt paving; procure and place lobe fill material, organics amendments, and lobe crest cobble on the south and west lobes and grade marsh channels; procure and place lobe fill material, organics amendments, and lobe crest cobble on the north lobe, grade blind and marsh channels, and fill to support stormwater outfall extensions; construct temp and final stormwater outfall pipe extensions; create access to west lobe through berm on the east side of SPI property and repair upon completion; establish staging area on SYC property; and manage stormwater and material staging.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge