Lampton Road Waterway Removal RFP
Posted
Nov 5, 2026
Nov 19, 2026
Work consists of perform a waterway removal. The work includes removal of existing concrete waterways, mobilization and demobilization, traffic control, construction surveying and staking, material testing and quality control, removal of existing concrete curb and gutter, pedestrian ramp, and existing storm drain pipes, saw-cut and removal of asphalt, installation of storm drain catch basin, installation of ads hp storm drain pipe, installation of concrete curb and gutter, installation of ada pedestrian ramp, installation of storm drain combo box and connecting to existing storm drain pipe and storm drain, installation of untreated base course and asphalt roadway, protection of existing and new manholes and readjusting rim elevation and concrete collar of existing and new manholes to new asphalt surface, and restoring landscape and irrigation to existing conditions.


