Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
South Blount County Utility District
Furnishing ultrafiltration membrane modules, associated appurtenances, and integration of new equipment into the existing scada system
Posted Date
Mar 8, 2026
Due Date
Mar 24, 2026
Release: Mar 8, 2026
South Blount County Utility District
Close: Mar 24, 2026
Furnishing ultrafiltration membrane modules, associated appurtenances, and integration of new equipment into the existing scada system
AvailableSouth Blount County Utility District
Work includes contractor mobilization, bonds, and insurance 1 LS; erosion prevention and sediment control 1 LS; traffic control plans and implementation 1 LS; pre-construction site video recording 1 LS; utility pole stabilization 15 EA; water main, ductile iron 4-inch 50 LF; water main, ductile iron 6-inch 350 LF; water main, ductile iron 8-inch 20 LF; water main, ductile iron 10-inch 1,875 LF; water main, ductile iron 12-inch 1,375 LF; water main, ductile iron 16-inch 19,150 LF; water main, PVC 2-inch 1,650 LF; water main, PVC 4-inch 2,475 LF; water main, PVC 6-inch 1,350 LF; water main, PVC 8-inch 100 LF; restrained joint dip water line in steel casing, installed by jack and bore 4-inch carrier in 8-inch casing 35 LF. See attached file.
Posted Date
Aug 20, 2025
Due Date
Sep 30, 2025
Release: Aug 20, 2025
South Blount County Utility District
Close: Sep 30, 2025
Work includes contractor mobilization, bonds, and insurance 1 LS; erosion prevention and sediment control 1 LS; traffic control plans and implementation 1 LS; pre-construction site video recording 1 LS; utility pole stabilization 15 EA; water main, ductile iron 4-inch 50 LF; water main, ductile iron 6-inch 350 LF; water main, ductile iron 8-inch 20 LF; water main, ductile iron 10-inch 1,875 LF; water main, ductile iron 12-inch 1,375 LF; water main, ductile iron 16-inch 19,150 LF; water main, PVC 2-inch 1,650 LF; water main, PVC 4-inch 2,475 LF; water main, PVC 6-inch 1,350 LF; water main, PVC 8-inch 100 LF; restrained joint dip water line in steel casing, installed by jack and bore 4-inch carrier in 8-inch casing 35 LF. See attached file.
South Blount County Utility District
Project consists of 383 (LF) of 8" PVC water line and all associated valves, fittings, and appurtenances.
Posted Date
Jan 2, 2025
Due Date
Jan 21, 2025
Release: Jan 2, 2025
South Blount County Utility District
Close: Jan 21, 2025
Project consists of 383 (LF) of 8" PVC water line and all associated valves, fittings, and appurtenances.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track South Blount County Utility District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database