Huntington Drive Transmission Main Project, Phase 1 RFP
Posted
Oct 13, 2026
Nov 3, 2026
Transmission Main Project, Phase 1. Scope of work includes - 1,470 LF installation of 12" C-900 PVC water main w/12" valve and fittings; 1 LS abandonment of existing water main, valves, vaults, fire hydrant and blow-off; see attached files.