Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Sierra County Waterworks District 1's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chairman
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Sierra County Waterworks District 1
This project involves the drilling and completion of a 570-foot public water supply well, installation of a well pump and related equipment, construction of a new well building, installation of approximately 1650-feet of 6-inch diameter transmission pipeline, construction of a new water treatment building with filters and controls, a new 16,000-gallon bolted steel backwash tank, and installation of telemetry equipment.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Sierra County Waterworks District 1
Close: Feb 19, 2026
This project involves the drilling and completion of a 570-foot public water supply well, installation of a well pump and related equipment, construction of a new well building, installation of approximately 1650-feet of 6-inch diameter transmission pipeline, construction of a new water treatment building with filters and controls, a new 16,000-gallon bolted steel backwash tank, and installation of telemetry equipment.
AvailableSierra County Waterworks District 1
Work consist of painting & coating, hvac, electrical, tree removal, ac paving aggregates, pipe & valves, bolted steel tank, misc metals, water filtration system, chemical injection system.
Posted Date
-
Due Date
Aug 27, 2025
Release: -
Sierra County Waterworks District 1
Close: Aug 27, 2025
Work consist of painting & coating, hvac, electrical, tree removal, ac paving aggregates, pipe & valves, bolted steel tank, misc metals, water filtration system, chemical injection system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.