Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Scott Township
Works includes approx 20,500 SY of Roadway Milling, base repair, concrete curb replacement, traffic control, line strippin.
Posted Date
Apr 11, 2025
Due Date
Apr 17, 2025
Release: Apr 11, 2025
Scott Township
Close: Apr 17, 2025
Works includes approx 20,500 SY of Roadway Milling, base repair, concrete curb replacement, traffic control, line strippin.
Scott Township
The scope of work includes removal and replacement of existing concrete roadway with a reconstructed bituminous roadway, milling, bituminous resurfacing, thermoplastic line striping, structure adjustments; add alternates for additional roadway and ADA ramp replacements; and all necessary appurtenances and restoration for said construction.
Posted Date
Mar 27, 2026
Due Date
Apr 9, 2026
Release: Mar 27, 2026
Scott Township
Close: Apr 9, 2026
The scope of work includes removal and replacement of existing concrete roadway with a reconstructed bituminous roadway, milling, bituminous resurfacing, thermoplastic line striping, structure adjustments; add alternates for additional roadway and ADA ramp replacements; and all necessary appurtenances and restoration for said construction.
Scott Township
The scope of work includes the removal and replacement of approx. 3,900 SF of concrete sidewalk, clearing and grubbing of debris in the path of the sidewalk, and all necessary appurtenances and restoration for said pedestrian improvement construction.
Posted Date
Jul 5, 2024
Due Date
Jul 19, 2024
Release: Jul 5, 2024
Scott Township
Close: Jul 19, 2024
The scope of work includes the removal and replacement of approx. 3,900 SF of concrete sidewalk, clearing and grubbing of debris in the path of the sidewalk, and all necessary appurtenances and restoration for said pedestrian improvement construction.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $23,800, use sole source.
Coops: Lead with COSTARS, Sourcewell, or H-GAC. Confirm process with the Township Manager or Finance Director and align with the department head.
Scott Township (PA) rarely or does not use sole source awards above $23,800. Practical notes: Deprioritize this path—attempting a sole source justification is inefficient due to process rigidity and lack of precedent.
Track Scott Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database