Learn more →Provide construction management at risk services.
Posted Date
Dec 1, 2025
Due Date
Jan 19, 2026
Release: Dec 1, 2025
Close: Jan 19, 2026
Provide construction management at risk services.
AvailableScope includes but not limited to roofing design of the existing roofing systems in 15 buildings approximately 302,235 sf in total. Disciplines include architectural, structural, mechanical, electrical, and plumbing engineering related to roofing design. The architect to determine if additional roof testing is needed before making the determination. Scope of work: possible removal and reinstallation of lightning protection system, scuppers current location & possible resizing, parapet & metal coping, access to hvac curbs & possible removal and reinstallation of hvac units, air vents & exhaust fans, smoke doors, hatch access, drainage pipes, downspouts, gooseneck pipe penetrations, panel breaker pipe penetration and possible replacement of curbs.
Posted Date
Jul 14, 2025
Due Date
Aug 18, 2025
Release: Jul 14, 2025
Close: Aug 18, 2025
Scope includes but not limited to roofing design of the existing roofing systems in 15 buildings approximately 302,235 sf in total. Disciplines include architectural, structural, mechanical, electrical, and plumbing engineering related to roofing design. The architect to determine if additional roof testing is needed before making the determination. Scope of work: possible removal and reinstallation of lightning protection system, scuppers current location & possible resizing, parapet & metal coping, access to hvac curbs & possible removal and reinstallation of hvac units, air vents & exhaust fans, smoke doors, hatch access, drainage pipes, downspouts, gooseneck pipe penetrations, panel breaker pipe penetration and possible replacement of curbs.
Work includes complete removal and replacement of roofing systems across two existing campus buildings, totaling approx 131,386 SF (building 1 = 104,400 SF, building 2 = 26,986 SF), demolition of the existing modified bitumen system down to the concrete deck, roof deck inspection, installation of new insulation and a 2-ply modified bitumen roofing system, and updates to rooftop components, install new roof insulation to achieve a minimum R-20.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
Work includes complete removal and replacement of roofing systems across two existing campus buildings, totaling approx 131,386 SF (building 1 = 104,400 SF, building 2 = 26,986 SF), demolition of the existing modified bitumen system down to the concrete deck, roof deck inspection, installation of new insulation and a 2-ply modified bitumen roofing system, and updates to rooftop components, install new roof insulation to achieve a minimum R-20.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis