Discover Opportunities months before the RFP drops
Learn more →Provide services that will lead and facilitate the search process for the superintendent/president.
Posted Date
Nov 5, 2025
Due Date
Jan 6, 2026
Release: Nov 5, 2025
Close: Jan 6, 2026
Provide services that will lead and facilitate the search process for the superintendent/president.
AvailableProject includes the following features: three (3) tennis courts, three (3) combination tennis/pickleball courts, and one (1) single tennis/pickleball court. A restroom building will also be included, with four (4) gender-neutral restrooms and one (1) utility/janitor’s room. Additionally, two (2) storage buildings, named Storage 1 and Storage 2, will be part of the project. There will also be shade structures, consisting of full cantilever hip-joined tension sails with three points. The total area of the shade structures will be 1,400 GSF. The improvements to the site will include driveways, a parking lot, site lighting, landscaping, fencing, accessible paths, bleachers, and gathering areas. The project includes the removal and abatement of existing underground utilities containing hazardous materials.
Posted Date
Jul 22, 2025
Due Date
Sep 29, 2025
Release: Jul 22, 2025
Close: Sep 29, 2025
Project includes the following features: three (3) tennis courts, three (3) combination tennis/pickleball courts, and one (1) single tennis/pickleball court. A restroom building will also be included, with four (4) gender-neutral restrooms and one (1) utility/janitor’s room. Additionally, two (2) storage buildings, named Storage 1 and Storage 2, will be part of the project. There will also be shade structures, consisting of full cantilever hip-joined tension sails with three points. The total area of the shade structures will be 1,400 GSF. The improvements to the site will include driveways, a parking lot, site lighting, landscaping, fencing, accessible paths, bleachers, and gathering areas. The project includes the removal and abatement of existing underground utilities containing hazardous materials.
Track, field, and scoreboard replacement: the project includes the following features: resurfacing the existing track surface-includes surface preparation, patching, and application of new track surfacing and striping for athletic performance. Replacement of synthetic turf field- complete removal and disposal of the existing turf system, subgrade preparation, and installation of new synthetic turf with infill. Removal of existing scoreboard assembly: disconnection and removal of the current scoreboard and associated components. Installation of new digital display system includes furnishing and installing a new id panel, video display, scoreboard, and clock box on the exterior of the existing parking structure "c", with all necessary electrical and data connections.
Posted Date
Jul 29, 2025
Due Date
Sep 8, 2025
Release: Jul 29, 2025
Close: Sep 8, 2025
Track, field, and scoreboard replacement: the project includes the following features: resurfacing the existing track surface-includes surface preparation, patching, and application of new track surfacing and striping for athletic performance. Replacement of synthetic turf field- complete removal and disposal of the existing turf system, subgrade preparation, and installation of new synthetic turf with infill. Removal of existing scoreboard assembly: disconnection and removal of the current scoreboard and associated components. Installation of new digital display system includes furnishing and installing a new id panel, video display, scoreboard, and clock box on the exterior of the existing parking structure "c", with all necessary electrical and data connections.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis