Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
San Francisco Redevelopment Agency/SFRA
The project consists of a 77,000 SF Lab Office TI with a Vivarium at Level 1. Includes Finish Carpentry, Demountable Partitions, Window Coverings, Capet & Wood Flooring, Specialty Ceilings and Wall Panels, Final Clean.
Posted Date
Mar 20, 2026
Due Date
Aug 4, 2026
Release: Mar 20, 2026
San Francisco Redevelopment Agency/SFRA
Close: Aug 4, 2026
The project consists of a 77,000 SF Lab Office TI with a Vivarium at Level 1. Includes Finish Carpentry, Demountable Partitions, Window Coverings, Capet & Wood Flooring, Specialty Ceilings and Wall Panels, Final Clean.
AvailableSan Francisco Redevelopment Agency/SFRA
The Project will consist of one building: Transbay 4 West, with approx. 314 units of family housing, which will be developed and owned by Mercy and YCD. Additional amenities include resident services spaces, childcare, ground floor retail, pedestrian mews, and street improvements via a new extension of Tehama St. The building is anticipated to be Type I construction. Trades being bought out for award: Archaeologist; Associate Architect; Civil Engineer; Construction Manager; Elevator Consultant; Environmental Consultant; Fire/Life Safety Code and Smoke Control Consultant Geotechnical Engineer / Settlement Engineer; Joint Trench Consultant; Landscape Architect; Mechanical, Electrical, and Plumbing (MEP) Engineer Shadow Consultant; Structural Engineer; Surveyor; Waterproofing/Building Envelope Consultant Arborist; Accessibility Consultant; Acoustic Consultant; Commissioning Agent; Corrosive Soils Consultant; ERRCS Consultant; Exterior Building Maintenance Consultant Door Hardware Consultant; Fire Service Access Elevator Consultant Hazardous Materials Consultant Lighting Designer; Solar Consultant; Specification Consultant; Sustainability Consultant; Title 24 / Energy Modelling; Traffic / Transportation Engineer; Trash / Waste Management; Wi-Fi Design Consultant; Wind Study Consultant; Special Inspection.
Posted Date
Mar 9, 2026
Due Date
Apr 9, 2026
Release: Mar 9, 2026
San Francisco Redevelopment Agency/SFRA
Close: Apr 9, 2026
The Project will consist of one building: Transbay 4 West, with approx. 314 units of family housing, which will be developed and owned by Mercy and YCD. Additional amenities include resident services spaces, childcare, ground floor retail, pedestrian mews, and street improvements via a new extension of Tehama St. The building is anticipated to be Type I construction. Trades being bought out for award: Archaeologist; Associate Architect; Civil Engineer; Construction Manager; Elevator Consultant; Environmental Consultant; Fire/Life Safety Code and Smoke Control Consultant Geotechnical Engineer / Settlement Engineer; Joint Trench Consultant; Landscape Architect; Mechanical, Electrical, and Plumbing (MEP) Engineer Shadow Consultant; Structural Engineer; Surveyor; Waterproofing/Building Envelope Consultant Arborist; Accessibility Consultant; Acoustic Consultant; Commissioning Agent; Corrosive Soils Consultant; ERRCS Consultant; Exterior Building Maintenance Consultant Door Hardware Consultant; Fire Service Access Elevator Consultant Hazardous Materials Consultant Lighting Designer; Solar Consultant; Specification Consultant; Sustainability Consultant; Title 24 / Energy Modelling; Traffic / Transportation Engineer; Trash / Waste Management; Wi-Fi Design Consultant; Wind Study Consultant; Special Inspection.
San Francisco Redevelopment Agency/SFRA
San Francisco City County seeks a General Contractor for a two-phase affordable housing project at Mission Bay South Block 4 East, comprising approximately 400 units in two high-rise buildings with amenities and limited commercial space. The project requires preconstruction services, with a focus on cost efficiency and compliance with local workforce and small business participation goals. Proposals are due by October 15, 2024.
Posted Date
Sep 4, 2024
Due Date
Oct 15, 2024
Release: Sep 4, 2024
San Francisco Redevelopment Agency/SFRA
Close: Oct 15, 2024
San Francisco City County seeks a General Contractor for a two-phase affordable housing project at Mission Bay South Block 4 East, comprising approximately 400 units in two high-rise buildings with amenities and limited commercial space. The project requires preconstruction services, with a focus on cost efficiency and compliance with local workforce and small business participation goals. Proposals are due by October 15, 2024.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge