Discover Opportunities months before the RFP drops
Learn more →Work includes to construct an auxiliary wet weather combined sewer to mitigate flooding.
Posted Date
Dec 10, 2025
Due Date
Feb 5, 2026
Release: Dec 10, 2025
Close: Feb 5, 2026
Work includes to construct an auxiliary wet weather combined sewer to mitigate flooding.
AvailableProvide programmatic support services for implementation of the Power Enterprise Capital Program, including the Hetch Hetchy Power portion of Hetch Hetchy Enterprise 10-Year Capital Plan, and CleanPowerSF 10-Year Capital Plan.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Close: Dec 15, 2025
Provide programmatic support services for implementation of the Power Enterprise Capital Program, including the Hetch Hetchy Power portion of Hetch Hetchy Enterprise 10-Year Capital Plan, and CleanPowerSF 10-Year Capital Plan.
AvailableRe-establish the flow path through the original spillway channel of the Dam spillway and to replace the bridge deck of the Dam Bridge, to extend the service life of the bridge until permanent improvements can be made; excavation and removal of landslide debris from Dam spillway discharge channel side embankment and bank erosion protection to re-establish original discharge channel flow path; replacement of existing damaged 1" to 2" - thick concrete overlay atop the Dam Bridge deck with new composite polyester polymer concrete as well as patch repair crack and voids in the bridge deck, girders and soffit.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
Close: Dec 11, 2025
Re-establish the flow path through the original spillway channel of the Dam spillway and to replace the bridge deck of the Dam Bridge, to extend the service life of the bridge until permanent improvements can be made; excavation and removal of landslide debris from Dam spillway discharge channel side embankment and bank erosion protection to re-establish original discharge channel flow path; replacement of existing damaged 1" to 2" - thick concrete overlay atop the Dam Bridge deck with new composite polyester polymer concrete as well as patch repair crack and voids in the bridge deck, girders and soffit.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis