Discover Opportunities months before the RFP drops
Learn more →Outdoor Concession and restroom facilities - concession stand of 24' by 28' building with a concrete sidewalk of 5' wide around the outside. Exterior lockable doors; shingled roof; wood framed 2" by 6" walls with insulation. See attached file.
Posted Date
Sep 12, 2025
Due Date
Nov 14, 2025
Release: Sep 12, 2025
Close: Nov 14, 2025
Outdoor Concession and restroom facilities - concession stand of 24' by 28' building with a concrete sidewalk of 5' wide around the outside. Exterior lockable doors; shingled roof; wood framed 2" by 6" walls with insulation. See attached file.
Work includes removal of old blacktop and sidewalks and dispose of material on site in area defined by school officials; relining parking spots and drop-off areas as prescribed by the school district; sawcut existing asphalt longitudinally along second street;sawcut each respective building entrance sidewalk;excavate 35' x 804' (including 5' sidewalk parallel to building); place 10' x 20' striped parking stalls along the entire paved strip, six stalls shall be ADA compliant, with two of these having a van unloading area.
Posted Date
Jun 10, 2025
Due Date
Jun 30, 2025
Release: Jun 10, 2025
Close: Jun 30, 2025
Work includes removal of old blacktop and sidewalks and dispose of material on site in area defined by school officials; relining parking spots and drop-off areas as prescribed by the school district; sawcut existing asphalt longitudinally along second street;sawcut each respective building entrance sidewalk;excavate 35' x 804' (including 5' sidewalk parallel to building); place 10' x 20' striped parking stalls along the entire paved strip, six stalls shall be ADA compliant, with two of these having a van unloading area.
Work includes removal of old grassy areas around the long jump and high jump pits; disposal of material on site in area defined by school officials; broom finished concrete with control joints installed; gator bar reinforcement added; color concrete to be determined by school district.
Posted Date
Jun 10, 2025
Due Date
Jun 30, 2025
Release: Jun 10, 2025
Close: Jun 30, 2025
Work includes removal of old grassy areas around the long jump and high jump pits; disposal of material on site in area defined by school officials; broom finished concrete with control joints installed; gator bar reinforcement added; color concrete to be determined by school district.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis