Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Ross Stores Corporate Office
Work includes tenant interior fit out with new finishes through out, new ceilings and lighting. minor exterior modification include new egress doors and new storefront with new entry or exist doors.
Posted Date
Jun 2, 2026
Due Date
Jun 23, 2026
Release: Jun 2, 2026
Ross Stores Corporate Office
Close: Jun 23, 2026
Work includes tenant interior fit out with new finishes through out, new ceilings and lighting. minor exterior modification include new egress doors and new storefront with new entry or exist doors.
AvailableRoss Stores Corporate Office
Work includes approx 25,575 SF tenant improvement. Project includes but is not limited to the following: Select demolition, concrete trenching, concrete, rebar, masonry, structural steel, miscellaneous steel, lumber, rough carpentry, insulation, roofing patching, window film, casework, countertops, metal studs and drywall, FRP, wall panels, ACT, flooring, ceramic tile, concrete sealing, painting, toilet partitions, restroom accessories, final cleaning, window film, corner guards, plumbing, fire sprinkler, HVAC, electrical, and fire alarm.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Ross Stores Corporate Office
Close: Dec 16, 2025
Work includes approx 25,575 SF tenant improvement. Project includes but is not limited to the following: Select demolition, concrete trenching, concrete, rebar, masonry, structural steel, miscellaneous steel, lumber, rough carpentry, insulation, roofing patching, window film, casework, countertops, metal studs and drywall, FRP, wall panels, ACT, flooring, ceramic tile, concrete sealing, painting, toilet partitions, restroom accessories, final cleaning, window film, corner guards, plumbing, fire sprinkler, HVAC, electrical, and fire alarm.
Ross Stores Corporate Office
Project consists of Improvement. See outside link.
Posted Date
Oct 8, 2025
Due Date
Oct 17, 2025
Release: Oct 8, 2025
Ross Stores Corporate Office
Close: Oct 17, 2025
Project consists of Improvement. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge