Landfill Unit 2 Cell #1 Construction RFP
Jul 28, 2026
Closes
Aug 4, 2026
The project shall include all necessary work to complete the construction of a new landfill cell, leachate collection system, along with leachate and sedimentation ponds. The work consists of Unclassified Excavation, Unsuitable Material Removal, 24" Clay Liner, 80 Mil Geosynthetic Liner, 12" Side Slope Cover Material, Granular Drainage Material, Coarse Aggregate, Geotextile Drainage Fabric, 8" HDPE Piping, Leachate Manholes, 18" RCP culverts and flared ends, 10' Chain Link Fence, 5-Strand Barb Wire Fence, Landfill Dewatering, Seeding, Fertilizing, Mulching, Rip Rap, Erosion Control Blanket, Erosion Control Wattles, High Flow Silt Fence, and other miscellaneous work.