Discover Opportunities months before the RFP drops
Learn more →Clean and prepare the roof deck. Cut out all blistered and damaged foam and haul away all debris. Re-foam the designated roof area and grind new foam to blend with existing foam. Power wash the entire roof deck. Mask off as necessary to prevent overspray. Re-coat the entire foam roof deck with 1 (one) coat of white elastomeric acrylic coating at a rate of 2 (two) gallon per 100 square foot. Contingency pricing for all wood rot discovered during the tear-off. Provide: cxd - plywood, 3/4 inch plywood, 2 x 6 x 12 framing, 2 x 4 x 12 framing, screws, nails, and flashing as needed.
Posted Date
Dec 8, 2025
Due Date
Dec 22, 2025
Release: Dec 8, 2025
Close: Dec 22, 2025
Clean and prepare the roof deck. Cut out all blistered and damaged foam and haul away all debris. Re-foam the designated roof area and grind new foam to blend with existing foam. Power wash the entire roof deck. Mask off as necessary to prevent overspray. Re-coat the entire foam roof deck with 1 (one) coat of white elastomeric acrylic coating at a rate of 2 (two) gallon per 100 square foot. Contingency pricing for all wood rot discovered during the tear-off. Provide: cxd - plywood, 3/4 inch plywood, 2 x 6 x 12 framing, 2 x 4 x 12 framing, screws, nails, and flashing as needed.
AvailableThis solicitation requests comprehensive roof repair services for Rialto Unified School District’s District Office and District Registration Center, including foam removal/repairs, power washing, and recoating with white elastomeric acrylic coating. The work includes contingency pricing for wood rot and provision of required materials and must be completed per the Contract Documents and Master Construction Schedule. The project covers two sites: 182 E. Walnut Ave, Rialto, CA (District Office) and 260 S. Willow Ave, Rialto, CA (District Registration Center).
Posted Date
Dec 8, 2025
Due Date
Dec 22, 2025
Release: Dec 8, 2025
Close: Dec 22, 2025
This solicitation requests comprehensive roof repair services for Rialto Unified School District’s District Office and District Registration Center, including foam removal/repairs, power washing, and recoating with white elastomeric acrylic coating. The work includes contingency pricing for wood rot and provision of required materials and must be completed per the Contract Documents and Master Construction Schedule. The project covers two sites: 182 E. Walnut Ave, Rialto, CA (District Office) and 260 S. Willow Ave, Rialto, CA (District Registration Center).
AvailableProvide districtwide painting services. Work includes the painting of several schools including the painting of exterior walls, brick walls, window frames, building trims, interior and exterior doors and jams, storage containers, portable buildings, and other surfaces.
Posted Date
Dec 1, 2025
Due Date
Jan 21, 2026
Release: Dec 1, 2025
Close: Jan 21, 2026
Provide districtwide painting services. Work includes the painting of several schools including the painting of exterior walls, brick walls, window frames, building trims, interior and exterior doors and jams, storage containers, portable buildings, and other surfaces.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis