Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Randall Community Water User District
The feasibility study shall evaluate whether the preliminary concept, alternate alignments, treatment and pumping configurations, phasing, or other alternatives best serve the Owner's long-term objectives identified by the Comprehensive Infrastructure Plan and the RFQ/RFP package. The public notice summary is not intended to limit the scope of alternatives, technical requirements, evaluation criteria, contract terms, or phase-gate decisions set forth in the RFQ/RFP package; the RFQ/RFP package and addenda control.
Posted Date
Jul 1, 2026
Due Date
Jul 29, 2026
Release: Jul 1, 2026
Randall Community Water User District
Close: Jul 29, 2026
The feasibility study shall evaluate whether the preliminary concept, alternate alignments, treatment and pumping configurations, phasing, or other alternatives best serve the Owner's long-term objectives identified by the Comprehensive Infrastructure Plan and the RFQ/RFP package. The public notice summary is not intended to limit the scope of alternatives, technical requirements, evaluation criteria, contract terms, or phase-gate decisions set forth in the RFQ/RFP package; the RFQ/RFP package and addenda control.
AvailableRandall Community Water User District
Procurement of chlorine and electrical equipment, components, and appurtenances involved within the operation of the treatment plant.
Posted Date
Jul 15, 2025
Due Date
Jul 31, 2025
Release: Jul 15, 2025
Randall Community Water User District
Close: Jul 31, 2025
Procurement of chlorine and electrical equipment, components, and appurtenances involved within the operation of the treatment plant.
Randall Community Water User District
Procurement of piping, equipment, components, and appurtenances involved within the operation of the treatment plant. Work includes the following supplemental equipment items: chlorine pressure gauges, 0-200 psi, with 500 psi over-pressure protection, complete with header valve, union nut, and adapter, to connect to the chlorine header line; chlorine vacuum gauges, 0-30 in hg, with 500 psi over-pressure protection, complete with header valve, union nut, and adapter, to connect to the chlorine line; chlorine gas filters; ppd chlorine vacuum regulator check unit and shut-off valves, with electric operator to reduce chlorine pressure to below atmospheric pressure and automatically shut-off the valve upon low temperature contact from the evaporator or loss of vacuum signal from the high/low vacuum switch. The unit shall include an integral regulator failure alarm switch. See attached file.
Posted Date
Apr 9, 2025
Due Date
Apr 30, 2025
Release: Apr 9, 2025
Randall Community Water User District
Close: Apr 30, 2025
Procurement of piping, equipment, components, and appurtenances involved within the operation of the treatment plant. Work includes the following supplemental equipment items: chlorine pressure gauges, 0-200 psi, with 500 psi over-pressure protection, complete with header valve, union nut, and adapter, to connect to the chlorine header line; chlorine vacuum gauges, 0-30 in hg, with 500 psi over-pressure protection, complete with header valve, union nut, and adapter, to connect to the chlorine line; chlorine gas filters; ppd chlorine vacuum regulator check unit and shut-off valves, with electric operator to reduce chlorine pressure to below atmospheric pressure and automatically shut-off the valve upon low temperature contact from the evaporator or loss of vacuum signal from the high/low vacuum switch. The unit shall include an integral regulator failure alarm switch. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Randall Community Water User District
This document outlines the 'Regional Waterline Connecting Neighbors' project by Randall Community Water, detailing construction phases, timelines, and anticipated benefits. Utilizing a design-build method to accelerate completion by summer 2027, the project aims to deliver clean, reliable water to Aurora-Brule Rural Water System, Davison Rural Water System, and provide a redundant water source to the City of Mitchell. The plan also emphasizes ongoing communication and minimizing disruption for impacted landowners.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Randall Community Water User District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge