Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Public Works Office, Facilities Support Contracts
Material: Estimated 10,000 pounds of various types of insulated copper wire, loose.
Posted Date
May 19, 2026
Due Date
Jun 2, 2026
Release: May 19, 2026
Public Works Office, Facilities Support Contracts
Close: Jun 2, 2026
Material: Estimated 10,000 pounds of various types of insulated copper wire, loose.
AvailablePublic Works Office, Facilities Support Contracts
40,000 pounds of Scrap Lead Acid Batteries, palletized and wrapped.
Posted Date
May 19, 2026
Due Date
Jun 2, 2026
Release: May 19, 2026
Public Works Office, Facilities Support Contracts
Close: Jun 2, 2026
40,000 pounds of Scrap Lead Acid Batteries, palletized and wrapped.
AvailablePublic Works Office, Facilities Support Contracts
Work consists of the removal of all interior HVAC, electrical, flooring, suspended ceilings, walls, doors in the current ROICC office suite as well as removal of a concrete landing and sidewalks outside of the suite. The project also includes the removal of the ceilings in Suite 55 only. The former ROICC office suite will be up-fit with new HVAC, electrical, interior flooring suspended ceilings, finishes, walls, doors and exterior ramps and sidewalks as per the design documents and all incidental related work.
Posted Date
-
Due Date
Mar 26, 2025
Public Works Office, Facilities Support Contracts
Close: Mar 26, 2025
Work consists of the removal of all interior HVAC, electrical, flooring, suspended ceilings, walls, doors in the current ROICC office suite as well as removal of a concrete landing and sidewalks outside of the suite. The project also includes the removal of the ceilings in Suite 55 only. The former ROICC office suite will be up-fit with new HVAC, electrical, interior flooring suspended ceilings, finishes, walls, doors and exterior ramps and sidewalks as per the design documents and all incidental related work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge