Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Pratt Airport Authority
Connecting Taxiways, and Parallel Taxiway (Joint Re-Seal and Patching). In general, this work will require the following approximate quantities: 7" Concrete Pavement Removal (50 SY); 7" Concrete Pavement (50 SY); Concrete Spall Repair (4,778 SF); Concrete Crack Repair (93 LF); Re-seal/Repair Concrete Joints (139,945 LF); Pavement Marking (65,491 SF).
Posted Date
Apr 29, 2026
Due Date
Jun 3, 2026
Release: Apr 29, 2026
Pratt Airport Authority
Close: Jun 3, 2026
Connecting Taxiways, and Parallel Taxiway (Joint Re-Seal and Patching). In general, this work will require the following approximate quantities: 7" Concrete Pavement Removal (50 SY); 7" Concrete Pavement (50 SY); Concrete Spall Repair (4,778 SF); Concrete Crack Repair (93 LF); Re-seal/Repair Concrete Joints (139,945 LF); Pavement Marking (65,491 SF).
Pratt Airport Authority
Agricultural leases on cash rent basis lease term will be for five (5) years on a cash rent basis.
Posted Date
Sep 18, 2025
Due Date
Oct 15, 2025
Release: Sep 18, 2025
Pratt Airport Authority
Close: Oct 15, 2025
Agricultural leases on cash rent basis lease term will be for five (5) years on a cash rent basis.
Pratt Airport Authority
Replace Runway 17/35 Lighting, PAPI’s, and REIL’s and Replace Airfield Signs and Beacon. Unclassified Excavation (2,000 CY); Airport Beacon Removal (1 LS); Installation of Airport Rotating Beacon (1 LS); Tip-Down Beacon Tower and Foundation (1 LS), Base Mounted Runway And Taxiway Light Fixture Replacements (83 EA); Lighted Airfield Guidance Sign Replacement (15 EA); REIL System (1 LS); PAPI System (2 LS); AWOS Circuit Relocation and Vault Work; Seeding and Erosion Control.
Posted Date
Feb 25, 2025
Due Date
Apr 24, 2025
Release: Feb 25, 2025
Pratt Airport Authority
Close: Apr 24, 2025
Replace Runway 17/35 Lighting, PAPI’s, and REIL’s and Replace Airfield Signs and Beacon. Unclassified Excavation (2,000 CY); Airport Beacon Removal (1 LS); Installation of Airport Rotating Beacon (1 LS); Tip-Down Beacon Tower and Foundation (1 LS), Base Mounted Runway And Taxiway Light Fixture Replacements (83 EA); Lighted Airfield Guidance Sign Replacement (15 EA); REIL System (1 LS); PAPI System (2 LS); AWOS Circuit Relocation and Vault Work; Seeding and Erosion Control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge