Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Port of Oswego Authority
Perform facility welding and maintenance repair. Overall project: The successful bidder shall perform the following at an hourly rate (5-year minimum experience required for related items): 24 hour / 7 days, minimum 2-hour response time, for time-sensitive repairs; welding repairs below rebuilding threshold; welding repair on equipment such as forklifts, pay loaders and general construction equipment. Must have knowledge of operational tolerances (5-year minimum experience); rail welding and repair to include switches. Must be familiar with rail operations and weight loads (5-year minimum experience); conveyor and service repair; 24 hour/7 day, minimum 2-hour response, mobile crane minimum 10 ton availability; repair as it relates to welding of facility, marina docks, port docks, and building, and maintenance of facilities; be insured for work performed while on port property; excavating. See attached file.
Posted Date
Jul 10, 2026
Due Date
Aug 10, 2026
Release: Jul 10, 2026
Port of Oswego Authority
Close: Aug 10, 2026
Perform facility welding and maintenance repair. Overall project: The successful bidder shall perform the following at an hourly rate (5-year minimum experience required for related items): 24 hour / 7 days, minimum 2-hour response time, for time-sensitive repairs; welding repairs below rebuilding threshold; welding repair on equipment such as forklifts, pay loaders and general construction equipment. Must have knowledge of operational tolerances (5-year minimum experience); rail welding and repair to include switches. Must be familiar with rail operations and weight loads (5-year minimum experience); conveyor and service repair; 24 hour/7 day, minimum 2-hour response, mobile crane minimum 10 ton availability; repair as it relates to welding of facility, marina docks, port docks, and building, and maintenance of facilities; be insured for work performed while on port property; excavating. See attached file.
AvailablePort of Oswego Authority
Provide a new, diesel driven articulated wheel loader.
Posted Date
Jul 25, 2024
Due Date
Aug 15, 2024
Release: Jul 25, 2024
Port of Oswego Authority
Close: Aug 15, 2024
Provide a new, diesel driven articulated wheel loader.
Port of Oswego Authority
Provide (1) new electric railcar mover.
Posted Date
Mar 4, 2025
Due Date
Apr 3, 2025
Release: Mar 4, 2025
Port of Oswego Authority
Close: Apr 3, 2025
Provide (1) new electric railcar mover.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge