Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Plum Creek Wastewater Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Authority Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Plum Creek Wastewater Authority
Project includes the demo of an existing 6' laminar flow hood and installation of a 6' exhaust fume hood. Preference is to have the hood procured by the installer.
Posted Date
Sep 11, 2025
Due Date
Sep 27, 2025
Release: Sep 11, 2025
Plum Creek Wastewater Authority
Close: Sep 27, 2025
Project includes the demo of an existing 6' laminar flow hood and installation of a 6' exhaust fume hood. Preference is to have the hood procured by the installer.
Plum Creek Wastewater Authority
Rehabilitation of a 33 MG reuse reservoir and the construction of a new reuse pump station. Reservoir relining per CDPHE impoundment requirements, a new pond aeration system, underdrain and the construction of a new reuse pump station that will tie into existing reuse transmission lines.
Posted Date
Jul 14, 2025
Due Date
Aug 15, 2025
Release: Jul 14, 2025
Plum Creek Wastewater Authority
Close: Aug 15, 2025
Rehabilitation of a 33 MG reuse reservoir and the construction of a new reuse pump station. Reservoir relining per CDPHE impoundment requirements, a new pond aeration system, underdrain and the construction of a new reuse pump station that will tie into existing reuse transmission lines.
Plum Creek Wastewater Authority
Seeking bids to procure equipment from the provided quotation and install an additional biofilter to our Autothermal Thermophilic Aerobic Digester (ATAD) system, exchange filter media in the current operational biofilter, and demolish.
Posted Date
Jan 30, 2025
Due Date
Feb 21, 2025
Release: Jan 30, 2025
Plum Creek Wastewater Authority
Close: Feb 21, 2025
Seeking bids to procure equipment from the provided quotation and install an additional biofilter to our Autothermal Thermophilic Aerobic Digester (ATAD) system, exchange filter media in the current operational biofilter, and demolish.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.