Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Piedmont Triad Regional Water Authority
Clearing, Grading, Erosion control, Pipe, Fittings, Manholes, Meter Vault, Electrical, Seeding, and mulching. Concrete, fencing, guard rail placement, Directional and Horizontal Boring, Asphalt patching, and driveways.
Posted Date
Jul 28, 2025
Due Date
Aug 21, 2025
Release: Jul 28, 2025
Piedmont Triad Regional Water Authority
Close: Aug 21, 2025
Clearing, Grading, Erosion control, Pipe, Fittings, Manholes, Meter Vault, Electrical, Seeding, and mulching. Concrete, fencing, guard rail placement, Directional and Horizontal Boring, Asphalt patching, and driveways.
Piedmont Triad Regional Water Authority
Project includes approx. 18,241 LF of 16" dip water main with meter vault and sitework and associated appurtenances; approx. 567 LF of 20" HDPE water main installed via hdd and associated appurtenances. Trade includes pipe work, water distrib. System/precast concrete water structures, electrical, clearing & grubbing, erosion and sedimentation control, traffic control signs, grading/trenching & backfilling for utilities bore & jack of conduits, concrete pavement repair, asphalt pavement repair, earthwork, landscaping, finishes/painting, exterior improvements, chain link fencing, lawn & grasses, pavement & appurtenances, quality control, class B rip-rap outlet stabilization, excavation, temp. Const. Entrance, gravel driveway repair, horizontal directional drill (HDD), concrete thrust blocking, meter vault site, tree removal, temp. facilities controls.
Posted Date
Jul 29, 2025
Due Date
Aug 21, 2025
Release: Jul 29, 2025
Piedmont Triad Regional Water Authority
Close: Aug 21, 2025
Project includes approx. 18,241 LF of 16" dip water main with meter vault and sitework and associated appurtenances; approx. 567 LF of 20" HDPE water main installed via hdd and associated appurtenances. Trade includes pipe work, water distrib. System/precast concrete water structures, electrical, clearing & grubbing, erosion and sedimentation control, traffic control signs, grading/trenching & backfilling for utilities bore & jack of conduits, concrete pavement repair, asphalt pavement repair, earthwork, landscaping, finishes/painting, exterior improvements, chain link fencing, lawn & grasses, pavement & appurtenances, quality control, class B rip-rap outlet stabilization, excavation, temp. Const. Entrance, gravel driveway repair, horizontal directional drill (HDD), concrete thrust blocking, meter vault site, tree removal, temp. facilities controls.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Piedmont Triad Regional Water Authority
This report, commissioned by the North Carolina Chamber Foundation, provides a comprehensive analysis of the intersection between economic development and water and wastewater infrastructure. It outlines challenges and offers a strategic roadmap with recommendations centered on strengthening data collection and water availability studies, promoting regional collaboration among utilities, expanding site readiness programs, developing a State Water Competitiveness Plan, and securing infrastructure investments through innovative financing and workforce training. The plan aims to sustain North Carolina's economic growth while safeguarding public health, environmental integrity, and long-term water security.
The meeting focused on the Regionalization Initiative Steering Committee agenda, which included kickoff and introductions, committee administration, review of previous committee meeting minutes, and new business. Key discussions under new business involved a presentation on the Regionalization Study, discussion of the PTRWA Board Resolution, committee discussion, a legislative update, and planning next steps. The committee administration section highlighted that the initiative began as a TREBIC Initiative in July 2024, with the PTRWA Board tasking the committee to steer the regionalization water and wastewater study. The Old Business section noted that the PTRWA Master Plan endorsing regionalization recommendations has been finalized. The Regionalization Study Presentation detailed regional challenges such as population growth straining utilities, infrastructure vulnerabilities, and cost control drivers for regionalization. It presented four alternatives for wastewater regionalization, with Alternative 4 (a comprehensive solution involving Greensboro, High Point, Randleman, Ramseur, Franklinville, and Asheboro at the Asheboro WWTP site) identified as the preferred option due to resilience and support for economic growth. Financial considerations, including estimated bill impacts for 'Go-it-alone' versus regionalization scenarios, were reviewed. The 'Next Steps' plan includes increasing awareness, determining participants by the end of 2026, developing agreements, conducting engineering, establishing financing, and implementing capital projects.
This strategic plan outlines the direction for the Piedmont Triad Regional Water Authority (PTRWA) to serve the water and wastewater needs of its member communities. It is structured around three strategic priorities: Enhanced Regionalization of Water and Wastewater Resources, Community Outreach and Education, and Infrastructure and Service Delivery. The plan aims to ensure the region's community and economic vitality by effectively managing high-quality water and wastewater resources, addressing expanding needs, and fostering collaboration to develop long-term solutions for sustainable growth.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Piedmont Triad Regional Water Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Mayor, City of Archdale (PTRWA Board Member – Archdale Representative)
Premium
Access the largest public sector contact database