Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Pennsville Sewerage Authority
Replacing the existing 6" asbestos cement force main serving Pumping Station No. 4 with a new 6" CLDIP and HDPE force main. Installation will be completed using both open cut and directional drilling methods. A key portion of the work involves a long directional drill under the New Jersey Turnpike, I-295, and the Salem Canal, with the new 6-inch carrier pipe installed inside 12" HDPE casing pipe using casing spacers. The project also includes new ductile iron yard piping at the pump station, air release and bypass vaults, a new terminal doghouse manhole, and full restoration of all disturbed areas. A bypass pumping setup will be required to keep the system in operation during the switchover.
Posted Date
Apr 20, 2026
Due Date
May 21, 2026
Release: Apr 20, 2026
Pennsville Sewerage Authority
Close: May 21, 2026
Replacing the existing 6" asbestos cement force main serving Pumping Station No. 4 with a new 6" CLDIP and HDPE force main. Installation will be completed using both open cut and directional drilling methods. A key portion of the work involves a long directional drill under the New Jersey Turnpike, I-295, and the Salem Canal, with the new 6-inch carrier pipe installed inside 12" HDPE casing pipe using casing spacers. The project also includes new ductile iron yard piping at the pump station, air release and bypass vaults, a new terminal doghouse manhole, and full restoration of all disturbed areas. A bypass pumping setup will be required to keep the system in operation during the switchover.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Pennsville Sewerage Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database