Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Otterbein Lebanon, Inc.
Provide all work per the contract documents including but not limited to sawcut existing asphalt/concrete pavement where indicated, strip & clear the existing land, remove existing site features, grade the site up to duplex pad ready elevation, provide new roadway with associated curb & gutter, concrete sidewalks, appropriate roadway signage & striping, utilities such as storm, sanitary, water, appropriate erosion control measures, perform a full depth replacement, plant necessary landscaping, seed and mulch grassed areas upon completion of construction.
Posted Date
Apr 13, 2026
Due Date
May 13, 2026
Release: Apr 13, 2026
Otterbein Lebanon, Inc.
Close: May 13, 2026
Provide all work per the contract documents including but not limited to sawcut existing asphalt/concrete pavement where indicated, strip & clear the existing land, remove existing site features, grade the site up to duplex pad ready elevation, provide new roadway with associated curb & gutter, concrete sidewalks, appropriate roadway signage & striping, utilities such as storm, sanitary, water, appropriate erosion control measures, perform a full depth replacement, plant necessary landscaping, seed and mulch grassed areas upon completion of construction.
AvailableOtterbein Lebanon, Inc.
Provide street improvements. Work includes 630 SY of pavement removed; 3,357 SF of walk removed; 83 SF of traffic island removed; 1,050 CY of excavation; 957 CY of excavation of subgrade; 957 CY of 16" granular material type c; 2,150 SY of subgrade compaction; 2,804 SF of 4" concrete walk; 48 SF of 6" concrete walk; 3,370 SY of seeding and mulching; 305 SY of sodding reinforced; 4065 SY of 1-1/4" pavement planing, asphalt concrete; 430 CY of 8" asphalt concrete base; 342 CY of 6" aggregate base; 206 CY of 1-1/4" asphalt concrete surface course, type 1 (449); 91 CY of 1-3/4" asphalt concrete intermediate course, type 2 (449); 3 CY of 2" asphalt concrete surface course, type 1 (449) driveways; 74 SY of 9" concrete traffic island. See outside link.
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Otterbein Lebanon, Inc.
Close: Jan 14, 2026
Provide street improvements. Work includes 630 SY of pavement removed; 3,357 SF of walk removed; 83 SF of traffic island removed; 1,050 CY of excavation; 957 CY of excavation of subgrade; 957 CY of 16" granular material type c; 2,150 SY of subgrade compaction; 2,804 SF of 4" concrete walk; 48 SF of 6" concrete walk; 3,370 SY of seeding and mulching; 305 SY of sodding reinforced; 4065 SY of 1-1/4" pavement planing, asphalt concrete; 430 CY of 8" asphalt concrete base; 342 CY of 6" aggregate base; 206 CY of 1-1/4" asphalt concrete surface course, type 1 (449); 91 CY of 1-3/4" asphalt concrete intermediate course, type 2 (449); 3 CY of 2" asphalt concrete surface course, type 1 (449) driveways; 74 SY of 9" concrete traffic island. See outside link.
Otterbein Lebanon, Inc.
The project will be constructed under a single contract to include all related work. A condensed general summary of the scope of work is as follows: 1. Provide all work per the contract documents including but not limited to: a. Sawcut existing asphalt/concrete pavement where indicated. B. Strip & clear the existing land as indicated. C. Remove existing site features listed on the plans. D. Grade the site up to duplex pad ready elevation and excavate detention ponds. E. Provide new roadway with associated curb & gutter. F. Install concrete sidewalks. G. Install appropriate roadway signage & striping. H. Install utilities such as storm, sanitary, water as indicated. I. Install appropriate erosion control measures as indicated on plans to epa standards. J. Perform a full depth replacement of king street. K. Build out alternate road work with associated utilities and grading. L. Plant necessary landscaping. M. Seed and mulch grassed areas upon completion of construction.
Posted Date
Jun 10, 2025
Due Date
Jun 30, 2025
Release: Jun 10, 2025
Otterbein Lebanon, Inc.
Close: Jun 30, 2025
The project will be constructed under a single contract to include all related work. A condensed general summary of the scope of work is as follows: 1. Provide all work per the contract documents including but not limited to: a. Sawcut existing asphalt/concrete pavement where indicated. B. Strip & clear the existing land as indicated. C. Remove existing site features listed on the plans. D. Grade the site up to duplex pad ready elevation and excavate detention ponds. E. Provide new roadway with associated curb & gutter. F. Install concrete sidewalks. G. Install appropriate roadway signage & striping. H. Install utilities such as storm, sanitary, water as indicated. I. Install appropriate erosion control measures as indicated on plans to epa standards. J. Perform a full depth replacement of king street. K. Build out alternate road work with associated utilities and grading. L. Plant necessary landscaping. M. Seed and mulch grassed areas upon completion of construction.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Otterbein Lebanon, Inc.'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database