Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
North Yakima Conservation District
Work includes: Provide TESC, dust control, and traffic control; establish a safe and secure construction base and work site; establish horizontal and vertical control by surveyor; provide construction staking for bridge and abutments by surveyor; clear and grub abutment sites including removal and disposal of existing abutments (logs set on soil); construct abutments; transport prefabricated bridge sections from Yakima to the site; assemble bridge at the site; place and secure bridge on the abutments; clean up the site and restore any damaged features; and stabilize disturbed areas.
Posted Date
Jun 30, 2026
Due Date
Jul 15, 2026
Release: Jun 30, 2026
North Yakima Conservation District
Close: Jul 15, 2026
Work includes: Provide TESC, dust control, and traffic control; establish a safe and secure construction base and work site; establish horizontal and vertical control by surveyor; provide construction staking for bridge and abutments by surveyor; clear and grub abutment sites including removal and disposal of existing abutments (logs set on soil); construct abutments; transport prefabricated bridge sections from Yakima to the site; assemble bridge at the site; place and secure bridge on the abutments; clean up the site and restore any damaged features; and stabilize disturbed areas.
AvailableNorth Yakima Conservation District
Installation of irrigation headworks, prefabricated fish screen with associated infrastructure, construction of an instream roughened channel for fish passage, bank stabilization, and piping of 4.1 miles of an irrigation delivery system to provide irrigation water to Purdin Irrigation Ditch users.
Posted Date
Nov 8, 2024
Due Date
Dec 5, 2024
Release: Nov 8, 2024
North Yakima Conservation District
Close: Dec 5, 2024
Installation of irrigation headworks, prefabricated fish screen with associated infrastructure, construction of an instream roughened channel for fish passage, bank stabilization, and piping of 4.1 miles of an irrigation delivery system to provide irrigation water to Purdin Irrigation Ditch users.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge