Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
North Perry Avenue Water District
Construct filtration system building, generator enclosure, filtration system and interior piping, site piping, connections to existing water system, backwash tank and piping, infiltration pond, electrical systems, general restoration and landscaping, and site security fencing.
Posted Date
Mar 6, 2026
Due Date
Apr 6, 2026
Release: Mar 6, 2026
North Perry Avenue Water District
Close: Apr 6, 2026
Construct filtration system building, generator enclosure, filtration system and interior piping, site piping, connections to existing water system, backwash tank and piping, infiltration pond, electrical systems, general restoration and landscaping, and site security fencing.
AvailableNorth Perry Avenue Water District
Install approx. 925 LF of 8" DI water main along Pine Road including two connections to existing water mains, new service connections and meters, pavement and vegetated areas restoration, and restoration of pavement markings.
Posted Date
May 16, 2024
Due Date
Jun 13, 2024
Release: May 16, 2024
North Perry Avenue Water District
Close: Jun 13, 2024
Install approx. 925 LF of 8" DI water main along Pine Road including two connections to existing water mains, new service connections and meters, pavement and vegetated areas restoration, and restoration of pavement markings.
North Perry Avenue Water District
Provide district engineering, land surveying, and hydrogeology services.
Posted Date
Jan 16, 2025
Due Date
Feb 12, 2025
Release: Jan 16, 2025
North Perry Avenue Water District
Close: Feb 12, 2025
Provide district engineering, land surveying, and hydrogeology services.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from North Perry Avenue Water District
The meeting included discussion regarding an employee probationary period review, and a decision not to renew a lease with A T & T upon its expiration. The board was informed that the 2018, 2019, and 2020 audit was completed and the report published. Updates were provided on the Center St Access Road Repair, the FEMA Hazard Mitigation Grant at Olympus 1MG Reservoir, GIS edits, Perry and Gilberton Manganese Removal Systems, and the FEMA HMGP Grant Pre-Application. The attorney discussed travel expenses and the use of the district credit card. The Operations Supervisor report included seasonal maintenance, the filling of a Utility Tech position, and summer time project planning. The General Manager reported on the status of climate and fluoridation bills, updates to the Open Public Meeting Act, and Phase 3 Rates/Fees.
Extracted from official board minutes, strategic plans, and video transcripts.
Track North Perry Avenue Water District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database