Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
North East Community Marina Authority
Required installed equipment, electrical, and demo of existing system Dual grinder motor pump D3672LSGX202-48, Core drill 450 feet to building connection point, provide and install new wet connection with 2 in line with trace wire. Pipe and wire provided by Authority. Run new electric lines core drilled to building from pump site, wire and breakers provided by contractor. Certified electrician to install connections.Pump out and back fill all septic tanks for inspection.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
North East Community Marina Authority
Close: Feb 10, 2026
Required installed equipment, electrical, and demo of existing system Dual grinder motor pump D3672LSGX202-48, Core drill 450 feet to building connection point, provide and install new wet connection with 2 in line with trace wire. Pipe and wire provided by Authority. Run new electric lines core drilled to building from pump site, wire and breakers provided by contractor. Certified electrician to install connections.Pump out and back fill all septic tanks for inspection.
North East Community Marina Authority
Provide labor and equipment for movement of 8,000 CY of sand from a designated catchment area and redeposited to a designated distribution area.
Posted Date
Jan 14, 2026
Due Date
Jan 30, 2026
Release: Jan 14, 2026
North East Community Marina Authority
Close: Jan 30, 2026
Provide labor and equipment for movement of 8,000 CY of sand from a designated catchment area and redeposited to a designated distribution area.
North East Community Marina Authority
Provide maintenance, repair, overhaul and support (MROS) services at and aboard the North East Community Marina, on an as-needed basis.
Posted Date
Dec 3, 2025
Due Date
Dec 16, 2025
Release: Dec 3, 2025
North East Community Marina Authority
Close: Dec 16, 2025
Provide maintenance, repair, overhaul and support (MROS) services at and aboard the North East Community Marina, on an as-needed basis.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track North East Community Marina Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database