Discover Opportunities months before the RFP drops
Learn more →The project consists of demolishing an abandoned water tower and the associated underground water piping back to the existing valve and capping. New life safety infrastructure will need to be installed for the Main Building Kitchen and Dining Area to provide adequate water pressure for the sprinkler system. The project will also consist of installing a new campus generator to the electrical infrastructure to provide adequate emergency power to the dormitories, kitchen, and central utility plant. The project will also consist of multiple roof replacements based on a roofing study that was completed in December 2022.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
The project consists of demolishing an abandoned water tower and the associated underground water piping back to the existing valve and capping. New life safety infrastructure will need to be installed for the Main Building Kitchen and Dining Area to provide adequate water pressure for the sprinkler system. The project will also consist of installing a new campus generator to the electrical infrastructure to provide adequate emergency power to the dormitories, kitchen, and central utility plant. The project will also consist of multiple roof replacements based on a roofing study that was completed in December 2022.
AvailableConstruction of Historic Superintendent's House renovation.
Posted Date
Aug 30, 2025
Due Date
Sep 9, 2025
Release: Aug 30, 2025
Close: Sep 9, 2025
Construction of Historic Superintendent's House renovation.
Historic superintendent's house renovation.
Posted Date
Jun 2, 2025
Due Date
Jul 30, 2025
Release: Jun 2, 2025
Close: Jul 30, 2025
Historic superintendent's house renovation.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis