Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Norfolk Southern Railway Police Department
Work includes replacement of the 536-foot section of the bridge over grand river within the same alignment as the existing bridge. An access road will be constructed from the nearby highway entrance to the existing construction lay down areas at the east end of the existing bridge. Foundation construction will involve two new piers, one new abutment and two existing piers to be modified. Piers will utilize drilled shafts for the deep foundation, and the abutment will utilize driven piles. Superstructure construction for two through plate girder spans of 99. 5 feet in length each, one through truss span of 302 feet in length, and one deck plate girder of 31 feet in length (536 feet in total). See attached file.
Posted Date
-
Due Date
May 28, 2026
Norfolk Southern Railway Police Department
Close: May 28, 2026
Work includes replacement of the 536-foot section of the bridge over grand river within the same alignment as the existing bridge. An access road will be constructed from the nearby highway entrance to the existing construction lay down areas at the east end of the existing bridge. Foundation construction will involve two new piers, one new abutment and two existing piers to be modified. Piers will utilize drilled shafts for the deep foundation, and the abutment will utilize driven piles. Superstructure construction for two through plate girder spans of 99. 5 feet in length each, one through truss span of 302 feet in length, and one deck plate girder of 31 feet in length (536 feet in total). See attached file.
AvailableNorfolk Southern Railway Police Department
Project consists of construction of a new steel entry tower, new walkways, platform handrails and modifications required to the existing steel and handrails. The work consist of the following major items: 1. Coordinate relocation/modification/protection of existing utilities as required. 2. Perform formed concrete repair of a selected area of the existing pier top. 3. Remove the existing east tower entry stair and erect the new, free-standing entry tower and connection bridge way into the east tower. 4. Remove and replace the U14-L15 stair on the downstream truss of the vertical span. 5. Remove the timber stair and steel platform below the machinery house and erect new steel stair and platform. 6. Remove existing and install new walkways and platforms at the northeast, southeast, and southwest corners of the vertical lift span. 7. Erect a new multipurpose platform, including various stairways, on the east tower 8. Erect new walkways and supporting members at the sheave maintenance level of the east tower. 9. Erect a new walkway on the east tower counterweight. 10. Modify the existing handrail as needed for integration of the new walkways and stairways. 11. Continually re-balance the counterweight and vertical lift span throughout construction. 12. Apply concrete surface sealer to new concrete surfaces. See outside link.
Posted Date
Jun 5, 2025
Due Date
Jun 26, 2025
Release: Jun 5, 2025
Norfolk Southern Railway Police Department
Close: Jun 26, 2025
Project consists of construction of a new steel entry tower, new walkways, platform handrails and modifications required to the existing steel and handrails. The work consist of the following major items: 1. Coordinate relocation/modification/protection of existing utilities as required. 2. Perform formed concrete repair of a selected area of the existing pier top. 3. Remove the existing east tower entry stair and erect the new, free-standing entry tower and connection bridge way into the east tower. 4. Remove and replace the U14-L15 stair on the downstream truss of the vertical span. 5. Remove the timber stair and steel platform below the machinery house and erect new steel stair and platform. 6. Remove existing and install new walkways and platforms at the northeast, southeast, and southwest corners of the vertical lift span. 7. Erect a new multipurpose platform, including various stairways, on the east tower 8. Erect new walkways and supporting members at the sheave maintenance level of the east tower. 9. Erect a new walkway on the east tower counterweight. 10. Modify the existing handrail as needed for integration of the new walkways and stairways. 11. Continually re-balance the counterweight and vertical lift span throughout construction. 12. Apply concrete surface sealer to new concrete surfaces. See outside link.
Norfolk Southern Railway Police Department
Project consists of Norfolk Southern MOW building new construction. See outside link.
Posted Date
-
Due Date
May 27, 2025
Norfolk Southern Railway Police Department
Close: May 27, 2025
Project consists of Norfolk Southern MOW building new construction. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Norfolk Southern Railway Police Department's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director, Norfolk Southern Police Department
Special Agent, Norfolk Southern Police Department; Community Impact Ambassador
Premium
Access the largest public sector contact database