Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Non-Flood Protection Asset Management Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Non-Flood Protection Asset Management Authority
Removal and replacement of the hanger doors, the roofing system and concrete decking.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Non-Flood Protection Asset Management Authority
Close: Jan 27, 2026
Removal and replacement of the hanger doors, the roofing system and concrete decking.
AvailableNon-Flood Protection Asset Management Authority
The project consists of, but is not limited to, cold milling, crack sealing, overlaying, and remarking taxiway b at airport. Work includes construction safety and security 00 ls; mobilization (maximum 10% of total bid); haul road restoration 200 ton; joint and crack repair (1-1/2" or less) 18,600 lf; joint and crack repair 800 lf; asphalt pavement patch 2070 sy; cold milling (1" depth) 25,100 sy; transition cold milling (1" to 2" depth) 1460 sy; 2" asphalt surface course 28,700 sy; asphalt leveling course 20 ton; airfield pavement markings, permanent, reflective, type i, gradation a beads 12000 sf; airfield pavement markings, permanent, reflective, type iii bead 500 sf. See attached file.
Posted Date
Jun 18, 2025
Due Date
Jul 17, 2025
Release: Jun 18, 2025
Non-Flood Protection Asset Management Authority
Close: Jul 17, 2025
The project consists of, but is not limited to, cold milling, crack sealing, overlaying, and remarking taxiway b at airport. Work includes construction safety and security 00 ls; mobilization (maximum 10% of total bid); haul road restoration 200 ton; joint and crack repair (1-1/2" or less) 18,600 lf; joint and crack repair 800 lf; asphalt pavement patch 2070 sy; cold milling (1" depth) 25,100 sy; transition cold milling (1" to 2" depth) 1460 sy; 2" asphalt surface course 28,700 sy; asphalt leveling course 20 ton; airfield pavement markings, permanent, reflective, type i, gradation a beads 12000 sf; airfield pavement markings, permanent, reflective, type iii bead 500 sf. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.